background image

 

 

CO2 welding current and voltage scope 

 

Welding wire 

diameter (mm) 

Short cut transition   

submarine-launched transition

 

Current (A) 

Voltage (V) 

Current (A) 

Voltage (V) 

0.6 

40-70 17-19 160-400 

25-28 

0.8 60-100 

18-19 

200-500 

26-40 

1.0 80-120 

18-21 

200-600 

27-40 

1.2 100-150 

19-23 

300-700 

28-42 

1.6 140-200 

20-24 

500-800 

32-44 

 

Welding speed choice 

 

This should be adjusted for the welding quality and production efficiency. If the 

welding speed was faster, protection effect would not be good, cooling speed should 

be bigger, the result is the welding crack’s forming would not be good and it would not 

be well for welding forming. If the welding speed was slower, it would be very easy to 

burn through the work piece and to make welding crack structure bigger and more 

rough. In real situation, welding speed would not be faster than 30m/hour. 

 

Welding wire 

extension length 

 

Welding wire extension length‘s increasing would be helpful for welding wire fusion 

quicken and increase the production efficiency. If the extension would be bigger, 

welding wire would be very easy to welding break, bigger splash, and make the 

welding process not steady. Usually, the length of welding wire should be the ten 

times longer that the diameter of welding wire

 
CO2 gas flow parameter choice 

Mainly considering the effect of protection. And, inside corner protection would be 

better than the outside’s. 

 

 

Welding parameter list 

Welding current and arc voltage will be the key point for the welding stability, welding 

quality and production efficiency. To keep the good welding quality, it should be a good 

collocation between welding current and arc voltage. It should be choosing basing on the 

diameter of welding stick and production efficiency. 

The checking the list for the welding current and arc voltage for regular using 

 

1.1 butt welding 

Содержание INMIG 250 IH

Страница 1: ...G MACHINE OPERATION MANUAL WARPP ENGINEERS PVT LTD B 1005 Western Edge II Near Metro Mall Off Western Express Highway Borivali E Mumbai 400 066 Tel 022 28542272 73 74 Fax 022 28542275 Website www warp...

Страница 2: ...CONTENTS Safe item 3 Brief of product 4 Properties 5 Assemble 6 Operation 8 Welding parameter checking list 10 Attention 11 Maintain 13 Regular check 14 Spare Part list 15...

Страница 3: ...would be isolated please make sure your working position is in safe situation Fume may be harmful for your health please keep your head out of the smoke avoid to take in the welding fume while welding...

Страница 4: ...oltage and rectification Character 1 IGBT inverter technology current controlling model high quality steady properties 2 constant voltage output high adaptability for electricity network 15 3 electron...

Страница 5: ...ity KVA 9 2 Current adjustment range A 50 250 Output voltage V 15 29 Duty cycle 60 Power factor 0 85 Efficiency 85 No Load Voltage 55 Wire feeder model INSIDE Post blow time S 1 0 5 Roller diameter mm...

Страница 6: ...Assemble Wire connection...

Страница 7: ...ting to the working piece Please connect torch to the joint of wire feeder and fasten it and put the welding wire into torch 3 roller assemble Please put the roller which is with welding wire on the a...

Страница 8: ...gas gauge goes well Please dressing the mask when you do the welding work Operation 1 Please turn on the the gas switch of welding machine open the valve of the gas cylinder and adjust the gas gauge...

Страница 9: ...be faster than 30m hour Welding wire extension length Welding wire extension length s increasing would be helpful for welding wire fusion quicken and increase the production efficiency If the extensio...

Страница 10: ...2 3...

Страница 11: ...4...

Страница 12: ...not meet the need of cooling it when strong current goes through it we use a cooling fan to make it work smoothly User should confirm the ventilation is not covered or blocked The distance between the...

Страница 13: ...to ensure the machine to work safely and efficiently Check whether the power of the welding machine is off before checking the external connectors Check the internal wiring five minutes after the powe...

Страница 14: ...g staff should clean the welding power with the condensed air for every 3 6 months Meanwhile check the fastening piece in the welding machineandnoloosephenomenon should happen 2 check often that if th...

Страница 15: ...eter Voltage DSP001 10K Potentiometer for Inductance POT004 Digital Display Meter Current DSP001 POT004 O tp t Connector Output Connector EURO Type with Strip OCN EURO S 13 Pin Connector Panel Mounted...

Страница 16: ...REAR VIEW F FAN007 Fan FAN007 Shunt SHUNT S 300 75 Snubber Card PCB SNB B39 S 300 75 MOV MOV001 IGBT IGBT5012...

Страница 17: ...LEFT VIEW Main Transformer MTAX B08 Control Transformer CTRAX B39 Output Rectifier Card PCB OUT FRM001...

Страница 18: ...TOP VIEW Main PCB PCB MIG 250 IH Drive Card PCB DRV 04 Capacitor Board PCB CP 250 IH Input Bridge Module with Surge Suppressor Board PCB IB 01...

Страница 19: ...BACK VIEW MCB MCB001 Fuse Holder...

Страница 20: ...0 MAIN TRANSFORMER MTRX005 OUT PUT CONNECTOR EURO TYPE WITH STRIP OCN EURO S 13 PIN CONNECTOR PANEL MOUNTED FEMALE CON13PM F 13 PIN CONNECTOR MALE CABLE SIDE CON13CM M SHUNT SHUNT S 300 75 LED GREEN L...

Отзывы: