background image

9

ASSEMBLY INSTRUCTIONS

PH-45-FB-LP (Liquid Propane), PH-50-FB-N (Natural Gas), PH-45-FB-R-LP
(Liquid Propane & PH-50-FB-R-N (natural gas).
Fixed base model for permanent mounting to deck or patio. (“R” indicates heater 

with remote switching option.  Requires 
switched 24 Volt power supply to heater.)

Step 1
Determine a safe, level and stable location for the 
base mount to be installed.
                                                           
Step 2
Secure the base to the deck or concrete pad with 
appropriate fasteners.  Use all three mounting 
holes.  Use corrosion resistant hardware.  Inspect 
condition of mounting studs before use of the 
heater each season.  Replace if rusty, loose, or 
shows signs of damage.  Use of through bolts is 
recommended on wood decks.
Step3
Remove the 3/8” x 1” bolt in the base of the 
heater head and set aside. (Figure 2 previous 
page 7). Secure heater head to flexible hose 
protruding from the top of the post.  Use two pipe 
wrenches to securely tighten.  A suitably 
approved gas pipe sealant must be used for all 
gas connections.  Slide head assembly into post. 
Aline the 3/8” hole in the post with the 3/8” 
threaded hole in the base of the heater head, and 
replace the 3/8” x 1” bolt.  Secure tightly.
Step 4
Slide the decorative cover onto the post from the 

bottom. Place the post into the basemount “T” and slide the decorative cover down over 
the post retainer.  Connect gas supply to the nipple protruding from the lower side of the 
tube.
Step 5
Secure the reflector to the heater head with the hardware provided.

CAUTION: Gas supply and electrical supply are to be according to all local and 
applicable codes.  Only those individuals licensed and qualified in the installation of gas 
fired heating appliances are to install this appliance.

If your heater is supplied with the remote switching option, connect your switched 24 V 
power supply to the spade connectors protruding from the bottom end of the post. 
Connect spade connectors at the top of the post to the marked connections on the heater 
head.  All supply wiring must be done in accordance will national, local and applicable 
codes.   Only those qualified and experienced in such wiring should be engaged for the 
installation of the electrical supply.

Deck or

concrete

pad

Gas  shutoff

by others

Underground

gas supply

Содержание Patio Plus

Страница 1: ...asy Radiant Works accepts no responsibility for damages whatsoever resulting in improper installation of this heater Improper installation voids all warranties This manual must remain with the heater...

Страница 2: ...red to be wood compressed paper plant fibres or other materials capable of being ignited and burned Such materials shall be considered combustible even though flame proofed fire retardant treated or p...

Страница 3: ...osed Patios Enclosed patios must be large enough to meet the clearance to combustibles and ventilation requirements as provided for in all applicable codes For very small enclosed patios Patio Plus he...

Страница 4: ...e kept clean 6 WARNING gas leaks are extremely dangerous and potentially explosive Do not use this product until a leak is repaired Easy Testing Procedure 1 Prepare a cup of soapy water 2 Attach regul...

Страница 5: ...ing options PH 45 H LP Liquid Propane PH 50 H N Natural Gas Hanging Units PH 45 H R LP Liquid Propane PH 50 H R N Natural Gas Hanging Units with 24 volt remote switching option PH 45 IG LP Liquid Prop...

Страница 6: ...heater and be sure to check all connections each time the cylinder is connected Always turn off the gas supply to the heater at the cylinder as soon as you are finished using the heater The L P cylin...

Страница 7: ...the heater head hose assembly into the 3 post The top of the post can be identified by the 3 8 hole being at the top end Line up the 3 8 hole in the post with the 3 8 hole in the base of the heater he...

Страница 8: ...ide the decorative cover onto the post from the bottom Place the post into the basemount T on the weighted base and slide the decorative cover down over the post retainer Connect gas supply to nipple...

Страница 9: ...t Aline the 3 8 hole in the post with the 3 8 threaded hole in the base of the heater head and replace the 3 8 x 1 bolt Secure tightly Step 4 Slide the decorative cover onto the post from the bottom P...

Страница 10: ...se of the heater head and replace the 3 8 x 1 bolt Secure tightly Step 4 Insert post into the ground support pipe and fasten with hardware provided Connect the gas supply to the nipple protruding from...

Страница 11: ...ess cannot be created on the gas supply piping Step 3 Apply a suitably approved pipe sealant to the nipple protruding from the bottom of the hanging bracket Turn the heater head onto the nipple to ach...

Страница 12: ...ank or other system After pilot is lit and it is mistakenly turned off the knob will be in an immovable position Wait 90 seconds and the thermocouple will cool and knob will be released to re light pi...

Страница 13: ...Defective gas valve Dirty pilot Replace thermopile Replace gas valve Clean pilot Main Burner won t light No 24 Volt power to unit Low gas pressure Blockage in orifice Manual valve not in on position...

Страница 14: ...tends a 3 YEAR warranty from the date of purchase to the original purchaser of this product against manufacturing defects in material and workmanship If this product fails to operate because of a manu...

Страница 15: ...15...

Отзывы: