11
ASSEMBLY INSTRUCTIONS
PH-45-H-LP (Liquid Propane) & PH-45-H-R-LP (Liquid Propane)
PH-50-H-N (Natural Gas) & PH-50-H-R-N (Natural Gas)
Hanging Model - complete with hanging bracket for suspending below an existing
supporting structure.
Step 1
Determine a safe and
appropriate location for the
heater to be installed bearing
in mind the required
clearances to combustibles
and all local and applicable
codes. Refer to the section in
this manual “Choosing a safe
location”. Clearances to
combustibles above the
heater, must be increased if the ceiling is made of plastic, vinyl or other materials that
may stretch or sag from convection heat. See “clearances and safe mounting practices”
on page 2.
Step 2
Suspend the hanging bracket from the underside of the permanent structure bearing in
mind the manufacturer’s specified clearances to combustibles. Ensure that suitable and
appropriate hardware is used to suspend the heater so that it is in a secure and fixed
position. Ensure that the heater is installed so that it hangs level to the ground and that
stress cannot be created on the gas supply piping.
Step 3
Apply a suitably approved pipe sealant to the nipple protruding from the bottom of the
hanging bracket. Turn the heater head onto the nipple to achieve a safe and tight gas
connection. Insert the bolts through the holes in the support bracket and tighten securely
with the nuts supplied so that the heater head is supported squarely and securely.
Step 4
Connect the gas supply to the gas supply connection located on the hanging bracket.
Step 5
R-Remote. If your heater has been supplied with a 24 Volt remote switching option,
connect the 24 Volt switched power supply to the 24 Volt terminal located on base of
burner. Minimum supply voltage is 24 Volt .20 V.A. Hard wiring to the heater is not
supplied by the manufacturer. It must be a high temperature type wiring to withstand
temperatures produced by the heater and should be run along the outside edge of the
hanging bracket to protect it from excessive heat.
All supply wiring must be done in accordance will national, local and applicable codes.
Only those qualified and experienced in such wiring should be engaged for the
installation of the electrical supply.
Roof deck or supporting structure
Minimum
16” clearance
to combustibles
Содержание Patio Plus
Страница 15: ...15...