TOWEL WARMER INSTALLATION INSTRUCTIONS
6
WARMUP INC.
USA: [email protected] | Tel.: 1-888-927-6333 | www.warmup.com
CANADA: [email protected] | Tel.: 1-888-592-7687 | www.warmup.ca
If you choose to locate the J-box elsewhere than at the recommended bottom right of the towel warmer, follow the instructions
below. You can also wire it directly into the switch box where you control your towel warmer, or into the box where your Warmup
4iE thermostat is mounted. Please ensure you comply to all local and national code requirements in regards to line voltage wire in
conduit. State and local regulations vary (flex conduit, rigid conduit or neither) and must be respected to avoid electrical hazards.
1. Mount the concealed cable mushroom into the wall where the lower right hand bracket will be located (lower right as you
look at the mounted towel warmer on the wall)
2.
Ensure you have a code compliant connection between the mushroom anchor and your electrical connection in the J-box.
3. Determine the other 3 anchor points and secure the wall anchors accordingly.
4. You must ensure that the left side of the towel warmer is secured to wood or metal studs or a structural element.
5. Your lead wire is 6ft long (except models TW001 and TW002 where it is 3ft). You can trim it to your needs leaving no less than
12” outside of the towel warmer.
6. Remove the cover plate from the lower right hand bracket.
7.
Sleeve the cable through the wall anchor mushroom and fish it through to your electrical connection. All electrical connections
and wiring must be compliant with local and national electrical codes. Please check with a licensed electrician.
8. Finally safely push your towel warmer into place and tighten the grub screws underneath each bracket.
CONCEALED CORD ENTRY WITH REMOTE J-BOX
1. Refer to the “Mounting your towel Warmer” section to identify exact location of the brackets.
2. The lower right bracket of your towel warmer will come supplied with a box cover plate that covers a standard 2x4 “single
gang” electrical box.
3.
To connect your towel warmer, first wire the power connection cord to the supplied 120V power in the J-box.
a) Always ensure the power is turned off at the breaker box to avoid electrical shock.
b) You can trim the power cord to your needs leaving no less than 12” exiting the towel warmer.
c) Upon secure connection to the line voltage, mount the towel warmer to the brackets and secure by tightening the grub
screws underneath each bracket.
CONCEALED CORD ENTRY WITH ATTACHED J-BOX
a) If your J-box is already located and supplied by the electrician, use that as the main point to determine where the other
3 brackets will fall. You must ensure that the left side of the towel warmer is secured to wood or metal studs or a
structural element.
b) If your J-box is not yet roughed-in, mark the space of the cover plate on the wall to determine the exact location.