15 September 2017
All Dimension are in mm………….Copyright ©
5
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
FITMENT OF VERMICULITE BACK AND SIDES PANELS & BAFFLE ASSEMBLY.
STEP : 1
STEP : 2
STEP : 3
STEP : 4
STEP : 5
STEP : 6
Place one Vermiculite Board side brick into the
Firebox as shown above.
Push the baffle right to the back of firebox.
Put the Vermiculite Board baffle brick in first on an angle
through the door frame, then repeat for the steel baffle. Join
the two parts together & lift it up holding it horizontally
resting on the one side bricks.
Fit back Vermiculite Board panel into the firebox
back, ensuring that it is sitting hard against the
back of the firebox.
Once the Vermiculite Board back is in place, ensure
Secondary Air Holes on the back plate are clear of
any obstructions.
While holding up the baffle assembly horizontally, insert
the opposite side brick in from underneath it, as shown
above. The 2 side bricks will now support the Baffle.
HOLD
Secondary
Air Holes