![Warmington SI 1100 Double Flue Скачать руководство пользователя страница 9](http://html2.mh-extra.com/html/warmington/si-1100-double-flue/si-1100-double-flue_installation-instructions-manual_3425866009.webp)
1 September 2016
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm………...Copyright on all products ©
9
Diagram
2:1
Side
Panel
(No
wings)
Side
Panel
(No
wings)
Rivets
20mm Air Gap at
Bottom of Bottom
Back Panel for
Caitec Air Venting.
Bottom Back Panel
Top Back Panel
Diagram
1:1
Step 2 :
Rivet 2X Side Panels to pre assembled Back Panels as shown in
2:1 , ensure the Top Flange on the Back Panel sits on the Side
Panels creating a 20mm Air Gap at the bottom for the Caitec Air
Venting .
Step 4 :
Assemble Top Caps to Heatshield & secure in
place with rivets as shown in diagram 4:1 . Install
Flue Liners over S/S Flue’s
Step 3 :
Install Firebox/Adaptor & secure in place , then
Install first length of Flue’s with a Spacer’s at the
Bottom , assemble Front Panel to Heatshield as
shown in diagram 3:1 & secure in place by riveting
as shown in 3:2
Diagram
4:1
Cap
Cap
Step 1 :
Assemble Top & Bottom Back Panel
together by Riveting together at the
centre as shown in diagram 1:1 .
The Top Back Panel has a double
Shield layer at the Top .
HEAT SHIELD ASSEMBLY - FOR INSTALLATION INTO HEBEL HEAT CELL (NO FASCIA KIT)
Heat Shield Check List
Front Panel
Back Panel
Side Panel LH
Side Panel RH
Top Cap LH
Top Cap RH
Packed By
Front Panel
Diagram
3:2
Diagram
3:1
Front Panel
Rivets
Rivets
Top Flange
This is the Rear View .
Turn around to Assemble
to the Side Panels
Rivets