Warmington SI 1100 Double Flue Скачать руководство пользователя страница 13

1 September 2016 

Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification. 

All Dimension are in mm………...Copyright on all products ©  

13

 

FLUE PENETRATION Vented  through  Alcove 
(Single lined Flue System)

 

Note : 

 
External Requirements 
Refer to AS/NZS2918:2001 4.9.1 
 
Install Flue system to AS/NZS2918:2001 
 
When using a rubber or Bitumen flashing (Butynol,  
Dectite) an Additional Flue pipe Baffle is required. 
 
All external air vents & ceiling penetrations must  
be bird proofed with permanently fixed screens. 
 
All flashing to comply with E2. 

Test Report Number

 

Date of Report

 

04/1039

 

20

th

 July 2004

 

04/1040

 

20

th

 July 2004

 

04/1041

 

20

th

 July 2004

 

FLUE PENETRATION  Vented through  Alcove (Double 
Lined Flue System)

 

FLUE PENETRATION Vented  through Top Flashing

 

All external air vents and ceiling penetrations are to be 
Vermin and Rodent proof. 

Note: FLUE SYSTEMS Casing….

 

Flue  system  may  require  to  be  Doubled  lined  to  comply. 

Ref ASNZS:2918:2001 4.3 Flue pipe casing

 

Содержание SI 1100 Double Flue

Страница 1: ...gton Fire Installation The Warmington unit is to be Installed by a Certified Warmington Installer or a Certified NZHHA Installation Technician See www homeheat co nz members for a Certified NZHHA SFAI...

Страница 2: ...w the wind will interact with the fire and flue system Care needs to be taken to ensure that the flue termination is in the correct position to maximise performance The Prevailing Wind Care needs to b...

Страница 3: ...Peak 30 Range 14 Estimated unless stated otherwise WARMINGTON FIREBOX DIMENSION FIREBOX HEAT SHIELD CABINET Adaptor Fitting Seal Adaptor to Firebox using High temp Gasket Sealant Bolt through holes pr...

Страница 4: ...ir from an external air source to ensure that the open fire has pre heated combustion air maximising efficiency while maintaining the home at constant pressure equilibrium reducing the risk of back dr...

Страница 5: ...50 Heat Cell Clearance Depth P 610 Heat Cell Clearance Height Q 2203 Hearth Width R 1550 Hearth Projection S 650 Window Height V 1000 Window Width W 1350 Chimney Chase Clearance X 450 Chimney Chase Cl...

Страница 6: ...0 Plinth Width T 1350 Plinth Depth U 610 Centre of Flue J 338 Chimney Chase Clearance X 450 Chimney Chase Clearance Y 1000 TIMBER PLAN FRONT ELEVATION CROSS SECTION BLOCK PLAN FRONT ELEVATION CROSS SE...

Страница 7: ...se Firebox SI 1100 DF Heat cell Clearance Width OO 1210 Heat Cell Clearance Depth PP 700 Heat Cell Clearance Height QQ 2390 Hearth Width RR 1550 Hearth Projection SS 650 Window Height VV 810 Window Wi...

Страница 8: ...ote If plastering the Heat Cell structure it is recommended to use a fibreglass mesh with a latex plaster to minimise the chance of the plaster cracking See your plasterer for correct materials and ap...

Страница 9: ...ld secure in place with rivets as shown in diagram 4 1 Install Flue Liners over S S Flue s Step 3 Install Firebox Adaptor secure in place then Install first length of Flue s with a Spacer s at the Bot...

Страница 10: ...Promina Fascia Kit List Tick Promina Top Panel 1 Promina LH Side Panel 1 Promina RH Side Panel 1 Joining Plate 2 Bolts Nuts 8 Wings 2 Lintel Cap 1 Packed By Step 5 Assemble Front Panel to Heat Shield...

Страница 11: ...m 3 2 Front Panel Diagram 3 1 Front Panel Diagram 2 1 Side Panel No wings Side Panel No wings 20mm Air Gap at Bottom of Bottom Back Panel for Caitec Air Venting Top Flange Diagram 4 1 Cap Cap HEAT SHI...

Страница 12: ...op Spider into position ensure that the legs of the spider are fitted inside the liner and that the spider is positioned hard down onto the liner and tighten with the screw and nut 3 Place the Flashin...

Страница 13: ...ng Butynol Dectite an Additional Flue pipe Baffle is required All external air vents ceiling penetrations must be bird proofed with permanently fixed screens All flashing to comply with E2 Test Report...

Страница 14: ...E VENTING THROUGH FLASHING No Insulation under flashing Insulation under flashing CHIMNEY CHASE FLASHING DETAILS SETTING ADD COWL AND FLASHING CONE HEIGHT Note Flashing Spigot height is determined by...

Страница 15: ...ion are in mm Copyright on all products 15 FLUE HEIGHT MINIMUM DETAILS FRAME OUT AND TRIM OUT DETAILS FOR CHIMNEY CHASE Option X Singled Lined Flue System Option Y Double Lined Flue System The flue ex...

Страница 16: ...ification All Dimension are in mm Copyright on all products 16 COMBUSTIBLE MANTLE CLEARANCES HEARTH CLEARANCES Note For Combustible Floors Minimum Hearth of 380mm A must be maintained When Raising can...

Страница 17: ...nths on the firebox from original date of purchase WARNINGS WARNING ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN WRITING BY THE TESTING AUTHORITY IS CONSIDERED AS BREACHING AS NZS 4...

Отзывы: