FIREBOX ACC CONCRETE HEAT CELL

 

The ACC Concrete Heat Cell is constructed around the firebox, using 75mm ACC Concrete. 

 

(2400x600x75) Power Panels are required for basic heat cell construction as shown in detail “Firebox with ACC Concrete Surround”

 

 
*Note: If plastering the Heat Cell structure, it is recommended to use a fibreglass mesh with a latex plaster to minimise the chance of the plaster cracking. 
(See your plasterer for correct materials and applications). 

Note:

 

1. 

All  Framing  is  to  be  clear  of  the  ACC  heat 

cell by 25mm 

2. 

All  other  clearances  are  to  comply  with 
ASNZS:2918,  and  or  the  manufacturers  in-
struction 

 

2 x 100x100mm 
Cool Air  & 
“Caitec Air”  
external Intake 
Vent each side or 
in rear 

Firebox 

 

 

SI 1100 

Surround Width 

GG 

1340 

Surround Height 

HH 

1285 

Surround Depth 

II 

635 

Hearth & Plinth 

 

75 

2 x 100x100mm 
Cool Air  & 
“Caitec Air”  
external Intake 
Vent each side or 
in rear of the ACC 
Block Heat Cell 

Содержание SI 1100 Double Flue

Страница 1: ...gton Fire Installation The Warmington unit is to be Installed by a Certified Warmington Installer or a Certified NZHHA Installation Technician See www homeheat co nz members for a Certified NZHHA SFAI...

Страница 2: ...w the wind will interact with the fire and flue system Care needs to be taken to ensure that the flue termination is in the correct position to maximise performance The Prevailing Wind Care needs to b...

Страница 3: ...Peak 30 Range 14 Estimated unless stated otherwise WARMINGTON FIREBOX DIMENSION FIREBOX HEAT SHIELD CABINET Adaptor Fitting Seal Adaptor to Firebox using High temp Gasket Sealant Bolt through holes pr...

Страница 4: ...ir from an external air source to ensure that the open fire has pre heated combustion air maximising efficiency while maintaining the home at constant pressure equilibrium reducing the risk of back dr...

Страница 5: ...50 Heat Cell Clearance Depth P 610 Heat Cell Clearance Height Q 2203 Hearth Width R 1550 Hearth Projection S 650 Window Height V 1000 Window Width W 1350 Chimney Chase Clearance X 450 Chimney Chase Cl...

Страница 6: ...0 Plinth Width T 1350 Plinth Depth U 610 Centre of Flue J 338 Chimney Chase Clearance X 450 Chimney Chase Clearance Y 1000 TIMBER PLAN FRONT ELEVATION CROSS SECTION BLOCK PLAN FRONT ELEVATION CROSS SE...

Страница 7: ...se Firebox SI 1100 DF Heat cell Clearance Width OO 1210 Heat Cell Clearance Depth PP 700 Heat Cell Clearance Height QQ 2390 Hearth Width RR 1550 Hearth Projection SS 650 Window Height VV 810 Window Wi...

Страница 8: ...ote If plastering the Heat Cell structure it is recommended to use a fibreglass mesh with a latex plaster to minimise the chance of the plaster cracking See your plasterer for correct materials and ap...

Страница 9: ...ld secure in place with rivets as shown in diagram 4 1 Install Flue Liners over S S Flue s Step 3 Install Firebox Adaptor secure in place then Install first length of Flue s with a Spacer s at the Bot...

Страница 10: ...Promina Fascia Kit List Tick Promina Top Panel 1 Promina LH Side Panel 1 Promina RH Side Panel 1 Joining Plate 2 Bolts Nuts 8 Wings 2 Lintel Cap 1 Packed By Step 5 Assemble Front Panel to Heat Shield...

Страница 11: ...m 3 2 Front Panel Diagram 3 1 Front Panel Diagram 2 1 Side Panel No wings Side Panel No wings 20mm Air Gap at Bottom of Bottom Back Panel for Caitec Air Venting Top Flange Diagram 4 1 Cap Cap HEAT SHI...

Страница 12: ...op Spider into position ensure that the legs of the spider are fitted inside the liner and that the spider is positioned hard down onto the liner and tighten with the screw and nut 3 Place the Flashin...

Страница 13: ...ng Butynol Dectite an Additional Flue pipe Baffle is required All external air vents ceiling penetrations must be bird proofed with permanently fixed screens All flashing to comply with E2 Test Report...

Страница 14: ...E VENTING THROUGH FLASHING No Insulation under flashing Insulation under flashing CHIMNEY CHASE FLASHING DETAILS SETTING ADD COWL AND FLASHING CONE HEIGHT Note Flashing Spigot height is determined by...

Страница 15: ...ion are in mm Copyright on all products 15 FLUE HEIGHT MINIMUM DETAILS FRAME OUT AND TRIM OUT DETAILS FOR CHIMNEY CHASE Option X Singled Lined Flue System Option Y Double Lined Flue System The flue ex...

Страница 16: ...ification All Dimension are in mm Copyright on all products 16 COMBUSTIBLE MANTLE CLEARANCES HEARTH CLEARANCES Note For Combustible Floors Minimum Hearth of 380mm A must be maintained When Raising can...

Страница 17: ...nths on the firebox from original date of purchase WARNINGS WARNING ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN WRITING BY THE TESTING AUTHORITY IS CONSIDERED AS BREACHING AS NZS 4...

Отзывы: