29 March 2021
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm
10
PROCEDURE FOR THE TEST AND COMISSIONING OF YOUR DECORATIVE BURNER
Ensure Gas Supply and the Power Supply (caution 240V) to the Unit.
•
Refer to Data Plate on this Specification for settings. The Data Plate is attached to the under carriage of
the Burner .
•
Loosen the Jet Test point and attach manometer (Digital is preferred). The Test Point is on the Right
Hand Side of the Gas Burner , as Shown Below .
•
Light Appliance and check the pressure to the Hi kPa value in the Table for maximum output.
NOTE : If setting the Pressure is required it is to be carried out by a Certified Gas Fitter.
•
If adjustments are necessary, remove the dust cap on the control value. The Pressure Adjustment Screw
is on the Front Side of the Gas Control Valve (shown in Diagram
B
in this specification) and are
Factory
set.
Pressure Setting: Set the pressure to the Hi kPa value in the table for maximum output. The burner will
operate any pressure between the hi and the low pressures.
Pressure Setting
: Turn the Burner on with the switch and wait for full ignition. Screw the adjusting screw clock-
wise to Increase the Outlet Pressure or screw counter clockwise to Decrease the Pressure to the desired set-
tings . Use a standard screw driver.
WARNING:
Ensure that the dust cap is replaced after adjustment