![Warmington SG 700 Скачать руководство пользователя страница 7](http://html2.mh-extra.com/html/warmington/sg-700/sg-700_installation-insrtuctions_3403023007.webp)
14 June 2016
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm……..Copyright ©
7
Note:
Fire for Outdoor use only,
NOT
to be Installed
Indoors .
ASSEMBLED VIEW OF HEBEL ENCLOSURE
Note:
HEBEL ENCLOSURE :
Constructed using 75mm Hebel Panels . Also 190
mm Block / Concrete / 75mm Brick can be used
for Heat Cell to these Dimensions & No Lesser .
Hebel Must be assembled using Hebel Glue &
Steel / Stainless Steel Screws to pin together until
Hebel Glue sets - Screws can remain in Hebel
Firebox
SG/EG 700
SG/EG 780
SG/EG 900
SG/EG 1100
SG/EG 1250
SG/EG 1500
Enclosure Height
S
810
810
810
810
810
810
Enclosure Depth
T
590
590
590
590
590
590
Enclosure Width
U
980
1060
1180
1380
1530
1780
HEARTH & PLINTH CONSTRUCTION DETAILS
*Note: If Solid Plastering the Heat Cell Structure, it is recommended to use a Fibreglass Mesh with a Latex Based Plaster to
minimise the chance of the Solid Plaster cracking. (See your Solid Plasterer for correct materials and applications).
Visit the Warmington Web Site for “Hebel” instruction (PDF Download).. www.warmington.co.nz
Seismic Restraint
Secure Firebox through
anchor points provided
SEISMIC RESTRIANTS
Hearth & Plinth
Not Provided - Must be
Non Combustible Material.
E.G. Hebel, Concrete,
Stone etc.
Note: Hearth and Plinth Construction.
Plinth to be Offset above Hearth by the Hearth Finishing’s
( e.g. Tiles / Granite / Solid Plaster / etc )
Raised Hearth’s & Plinth’s with cantilevered
Hearth’s must be adequately supported to take
the weight in Accordance with the NZ Building
Code .
Offset for
Hearth
finishing
Offset
This is an example of a Raised & cantile-
vered Hearth . See Spec for details .
U
T
S
Hearth & Plinth
NOT Provided
Warm Air
Outlet Vents
Cool Air
Inlet Vent