![Warmington SG 700 Скачать руководство пользователя страница 3](http://html2.mh-extra.com/html/warmington/sg-700/sg-700_installation-insrtuctions_3403023003.webp)
14 June 2016
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm……..Copyright ©
3
POINTS TO CONSIDER PRIOR TO INSTALLATION
INSTALLATION ORDER OF OPERATIONS
Prior to Construction and Installation
Important Notes:
1.
Consult a licenced certified gas fitter for correct gas installation.
2.
Install to current standards.
3.
Must be Installed to Manufacture’s Specifications .
4.
All new Installations require a Council Consent No Application call your Local Council for details .
5.
Allow for Gas Supply to Heat Cell at Rear, and Power Supply to Rear if required ( having the fire on site will help).
* For special requirements concerning materials (Timber Mantle and Surrounds) within close proximity of Warmington
products, please contact your local Warmington Agent or Technical Consultant.
Stage 1: Frame Construction Procedure by Builder.
6.
Mark out Heat Cell Clearance requirements.
7.
Build Timber Framing to Heat Cell Clearances requirements.
8.
Construct Plinth only , to required height. *
Stage 2: Install Procedure by approved “Warmington Installer” or a Certified “NZHHA SFAIT Installer” see
www.homeheat.co.nz/members & follow steps to get an Certified Installer in your area .
9.
Fit Fire to Plinth. (Ensure Gas Supply Line and power if required is fed through the rear of Firebox.)
10.
Heat Cell should be Fully Constructed of Non-Combustible Material. (e.g. Hebel)
11.
Ensure 40 mm Rebate to form a Drip Edge.
12.
Ensure Heat Cell Alcove is Vented to keep Alcove Cool. (2 x Ø100mm Vents should be fitted, 1 at the Top of the alcove
and 1 at the base of the Alcove to allow air flow .
Note: Clean and touch up paint on the fire and cover if necessary.
Stage 3: Finishing Procedure by Builder.
13.
Construct Hearth to required Thickness. *
14.
Finish Framing of Heat Cell Alcove.
15.
Close in Heat Cell Alcove.
Finish Heat Cell Alcove and Hearth to Customer’s requirements (e.g. paint / tiles).
*
Note: Certified Installer can also Install Hearth and Plinth .
Maintenance.
Visually Inspect Fireplace. The gas burner may be serviced annually or more frequently if required by a certified gas fitter.
Ensure that Firebox is operated according to Manufacture’s Instructions.
Venting to the Cavity.
This air is to allow the Cavity to Vent the Warm Air out of the heat cell. Each Fire has different ways of venting the cavity to
the outside, care needs to be taken to ensure that venting dose not cause a hazard.
The Topography of the Land .
The slope and position of the Land in relation to the Home has a bearing on how the wind will interact with the Fire. Care
needs to be taken to ensure that the Fire is in the correct position to maximise performance .
Hearth and Plinth: NOTE: (Not Provided in Hebel Cell Kit)
The height of the Hearth off the Floor. The Finishing that is to be used on the hearth is to be allowed for at the design stage.
Fire Clearances :
To be maintained to the Manufactures Instructions .
Rebate Firebox :
All Warmington Flueless Gas Fires are to be Rebated 40mm into it`s Enclosure if exposed to Direct Weather .
Protect Electronics :
Ensure that all Electronic Equipment on the EG Fire Range is protected from the Weather . Damage may occur when Elec-
tronics become in Contact with Moisture &/or any Water & is not covered by the Warranty .