Page
65
1. FIT DIVERTER ASSEMBLY SEALS
Apply suitable lubricant to the two Diverter
Assembly Seals (supplied loose) then fit to
the end of the boiler flue pipe noting the
correct orientation.
The seals MUST be fitted as shown with
the outer surface sloping away from the
end of the pipe to allow the Diverter
Assembly to push over the seals.
2. FIT SPLIT RING-NUT
Fit the Split Ring-nut by pulling open the split and
pushing the nut over the pipe. Ensure the threaded
end is facing towards the seals.
3. FIT & SECURE DIVERTER ASSEMBLY
Lubricate the inside of the Diverter Assembly „B‟
then push the assembly onto the end of the pipe
and over the 2 seals. Use the Split Ring-nut to force
the seals into the assembly ensuring that they remain
flat on the pipe.
Tighten the Ring-nut into the assembly ensuring the
assembly is tight onto the end of the pipe and that the
seals are well compressed. The Diverter Assembly
should be firmly attached to the pipe when complete.
4. ADJUST DIVERTER ASSEMBLY
Turn the 90° bend on the Diverter Assembly „B‟ around
to 45°, pointing towards the wall. If necessary, adjust
the position of the rubber dresser on the Diverter
Assembly in order to ensure a good weather seal.
5. ASSEMBLE PLUME MANAGEMENT KIT
Assemble the remainder of the Plume Management Kit
as shown over the page, securing the whole assembly
into place using the Mounting Brackets „E‟.
It will be necessary to cut one of the Extensions „F‟ to form Short Extension „C‟,
depending on the spacing of the boiler from the wall.
If fitting the flue extension pipe (on a 150HE or Combi model), glue the rubber
dresser of the Diverter Assembly „B‟ to the boiler casing using silicone sealant in
order to secure the assembly in place.
Ensure the location of the terminal complies with all local legislative requirements.
Содержание Boilerhouse B120HE
Страница 13: ...4 5 2 U Series Utility Casing Components Models up to 120 HE 150 HE Models Page 11...
Страница 14: ...4 5 3 U Series Utility Pre Wired UHE Key Components Models up to 120 HE 150 HE Models Page 12...
Страница 15: ...4 5 4 U Series Utility Pumped UPHE Key Components Models up to 120 HE 150 HE Models Page 13...
Страница 16: ...Page 14 4 5 5 U Series Utility System USHE Key Components 4 5 6 U Series Utility Combi UCHE Key Components...
Страница 17: ...4 5 7 K Series Kabin Pak Casing Components Models up to 120 HE 150 HE Models Page 15...
Страница 18: ...4 5 8 K Series Kabin Pak Pre Wired KHE Key Components Models up to 120 HE 150 HE Models Page 16...
Страница 19: ...4 5 9 K Series Kabin Pak Pumped KPHE Key Components Models up to 120 HE 150 HE Models Page 17...
Страница 22: ...Page 20 4 5 13 Combi Pipe Layout UCHE KCHE Models...
Страница 23: ...Page 21 5 TECHNICAL DETAILS 5 1 Combi Sequence of Operation Flow Chart...
Страница 25: ...Page 23 5 2 3 U Series Utility 150HE Models 5 2 4 U Series Utility UCHE Models...
Страница 27: ...Page 25 5 2 7 K Series Kabin Pak 150HE Models 5 2 8 K Series Kabin Pak Base Tray 150HE Models...
Страница 28: ...Page 26 5 2 9 K Series Kabin Pak KCHE Models 5 2 10 K Series Kabin Pak Base Tray KCHE Models...
Страница 41: ...Page 39 6 3 2 Wiring Schematic...
Страница 66: ...Page 64 8 1 10 Kabin Pak Plume Management Kit KPMK The kit comprises...
Страница 78: ...Page 76 13 BURNER FAULT FINDING 13 1 Riello RDB...
Страница 79: ...Page 77 14 COMBI FAULT FINDING 14 1 Central Heating...
Страница 80: ...Page 78 14 2 Domestic Hot Water...
Страница 91: ......