7 OIL SUPPLY
1. Oil Tank
Steel tanks constructed to BS799: PART 5 should be painted on the outside only
and mounted on piers to prevent corrosion. Plastic oil tanks are also available and
can be suitable for installation at ground level. However, oil should never be
stored in translucent plastic containers.
The tank outlet should be at a height to provide sufficient clearance to allow for
proper maintenance of any isolation valve, oil filter or water separator fitted.
2. The pipe from the oil tank to the burner should be run in copper, steel or
aluminium. Galvanised pipe and fittings should not be used. The pipework should
terminate close to the boiler and be fitted with an isolating valve and filter. A
remote sensing fire valve must be fitted to the oil line preferably before the oil line
enters the building (BS5410 : PART 1).
Depending on the position of the tank a two pipe system may be required. One
and two pipe oil systems are shown below. As an alternative to a two pipe system,
a Tigerloop or other approved de-aerator may be used.
7.1 One Pipe Gravity System
Total Maximum Pipe Length (m)
Head H(m)
0.5 1.0 1.5 2.0
ID 8mm
10
20
40
60
ID 10mm
20
40
80 100
Note:
Plastic oil level gauges may shrink
when exposed to kerosene thus allowing
the ingress of water. Pump failures due
to water contamination are not covered
under warranty.
Содержание Boilerhouse B120HE
Страница 13: ...4 5 2 U Series Utility Casing Components Models up to 120 HE 150 HE Models Page 11...
Страница 14: ...4 5 3 U Series Utility Pre Wired UHE Key Components Models up to 120 HE 150 HE Models Page 12...
Страница 15: ...4 5 4 U Series Utility Pumped UPHE Key Components Models up to 120 HE 150 HE Models Page 13...
Страница 16: ...Page 14 4 5 5 U Series Utility System USHE Key Components 4 5 6 U Series Utility Combi UCHE Key Components...
Страница 17: ...4 5 7 K Series Kabin Pak Casing Components Models up to 120 HE 150 HE Models Page 15...
Страница 18: ...4 5 8 K Series Kabin Pak Pre Wired KHE Key Components Models up to 120 HE 150 HE Models Page 16...
Страница 19: ...4 5 9 K Series Kabin Pak Pumped KPHE Key Components Models up to 120 HE 150 HE Models Page 17...
Страница 22: ...Page 20 4 5 13 Combi Pipe Layout UCHE KCHE Models...
Страница 23: ...Page 21 5 TECHNICAL DETAILS 5 1 Combi Sequence of Operation Flow Chart...
Страница 25: ...Page 23 5 2 3 U Series Utility 150HE Models 5 2 4 U Series Utility UCHE Models...
Страница 27: ...Page 25 5 2 7 K Series Kabin Pak 150HE Models 5 2 8 K Series Kabin Pak Base Tray 150HE Models...
Страница 28: ...Page 26 5 2 9 K Series Kabin Pak KCHE Models 5 2 10 K Series Kabin Pak Base Tray KCHE Models...
Страница 41: ...Page 39 6 3 2 Wiring Schematic...
Страница 66: ...Page 64 8 1 10 Kabin Pak Plume Management Kit KPMK The kit comprises...
Страница 78: ...Page 76 13 BURNER FAULT FINDING 13 1 Riello RDB...
Страница 79: ...Page 77 14 COMBI FAULT FINDING 14 1 Central Heating...
Страница 80: ...Page 78 14 2 Domestic Hot Water...
Страница 91: ......