background image

steP 5

steP 4

steP 3

Set Roof on Top of Hutch.

Align Hinges and Attach 

4

- 3/4" Bolts.

Install “Stop Chain” as Shown Below

using 

1

- 3/4" Bolt. 

ITEM #01490

Made in China

to the exact Design Specifications of

Ware Mfg.inC

Phoenix, aZ, USa 85004

ViSiT US aT

www.waremfg.com

Slide Floor into Bottom of Hutch, Wire 

Side Up. Align Side Holes and Fasten 

Back Panel 

(D)

 to Side Panels using

6

- 1 1/2" Bolts and 

6

- Wing Nuts.

FLOOR

Wing Nuts should face into the Hutch.

Tip:

 This item (as any wood) should be periodically (every 12 to 18 months

depending on climate) treated with a non-toxic exterior grade stain.

Slide Pan in Front Below Floor on Pan 

Rails. Attach Wind Guards to Outside

Side Panels Using 

4

- 3/4" Bolts,

4

- Washers and 

4

- Wing Nuts.

Attach Chick-N-Roost Using

2

- 1 1/2" Bolts and 

2

- Washers

3/4" Bolt

3/4" Bolt

Attach Egg Door with

1

- 3/4" Bolt and 

1

- Wing Nut

Отзывы: