
Miscellaneous—Carrier
Continued on next page
AP88438,0000104 -19-17NOV12-1/3
Welding On Carrier or Head—TR100 System
IMPORTANT: Electrical system damage will occur
by electrical welder current. Always isolate
electrical components before welding.
Failure to isolate electrical equipment
will damage components and require
component replacement.
When welding, electrical equipment must be isolated.
Failure to isolate electrical equipment will damage the
electrical system and require component replacement.
Turning key switch to OFF position is not sufficient.
1. Park carrier and place harvester head on a flat even
surface.
2. Turn TR100 key switch control to the OFF position.
3. Turn off any electronics that are wired directly from
the battery.
4. Turn off main power to carrier.
5. Disconnect carrier battery (G1).
TX1022193
—UN—17MA
Y07
TX1033494A
—UN—14DEC07
4-1-6
081921
PN=78
Содержание HTH616C SIII
Страница 2: ......
Страница 88: ...Miscellaneous Wood Measurement 4 4 2 081921 PN 88...
Страница 91: ...Index Index 3 081921 PN 91...
Страница 92: ...Index Index 4 081921 PN 92...