Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, wood saw, step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or 

extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base dimensions,  

The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap 

the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding 

ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

Refer to the instructions pages for you specific product code

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Содержание 03COR0707-V4

Страница 1: ...ssible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect...

Страница 2: ...f Frame 28 x 28 x 2025mm QTY 1 FS2828 2025MM 10 11 Roof Frame 28 x 28 x 1149mm QTY 2 FS2828 1149MM 12 Roof Frame 28 x 28 x 1196mm QTY 1 FS2828 1196MM 13 Roof Support 44 x 58 x 1906mm QTY 1 F4458 1906M...

Страница 3: ...crews 19 1 7 8 Pre Assembly Position press lock on the door align with key hole and fix into position using 4 x 10mm screws Then fit barrel bolts to top and bottom of the door as shown in diagram Use...

Страница 4: ...e fitting instructions Pre drill hole 60mm screw Step 2 Fix the window panels and the door panel with 6x60mm screws as shown in the diagram 6x60mm Screws 2 2 1 4 17 Step 3 Place rear panel left agains...

Страница 5: ...1 12 Step 6 Layout the roof sheet and position the roof framing onto the sheet as shown in the diagram Ensure the framing is level around the edges and fix into place using 30mm screws It is recommend...

Страница 6: ...the dotted lines use fascia width as a cutting guide Cut the triangle with 50mm overhang again using fascia as a guide 100x Felt Tacks 17 F r o n t Corner Corner Triangle 3 16 16 16 16 Step 9 Attach...

Страница 7: ...e reference Step 12 Attach the rain guards to the building fixing in place above each window using 3x60mm screws per guard 6x60mm Screws 60mm screw Pre drill hole 24 Step 13 Fix the rear cover trimsto...