BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and
annual treatment.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly
smaller than the external measurement of the building, i.e. the cladding should overlap the base, creating a run off for water. It is also recommended
that the floor be at least 25mm above the surrounding ground level to avoid flooding.
Step 6
Use 30mm screws to fix each
cover trim.
12 x 30mm screws
1
7
7
Step 7
20x 30mm Screws
Fix the roof panels on either side
as shown in diagram.
Fix panels into position using
30mm screws from the top of the
panel, straight into the framing.
Pre drill holes before hand.
Ensure the larger over hang on
both panels are facing each
other at the top point.
9
6
Fix the roof eaves to the roof panel
using 30mm screws. Make sure the
roof eave is flush with the edges.
Step 8
Lay the felt sheet over the roof in one
strip, making sure to leave an equal over
hang at the front and back. Leave a
50mm overhang at the sides.
Fix using felt tacks at 100mm intervals
30 x felt tacks
Felt
tacks
13
Step 9
Fix fascias and finials using
40mm screws. Pre drill holes to
avoid splitting. Ensure to trap
the felt between the fascia and
building.
8x 40mm screws
10
8
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
40mm
screw