Assembly
Step 1
Remove transportation blocks
from the bottom of each panel
before beginning assembly. Each
Panel should have two blocks.
Step 2
Place floor on a firm and
level base, ensure base has
suitable drainage free from
areas where standing water
can collect. (see front page
on base requirements).
5
Fix the hinge to the door using 30mm
screws ensuring that the screws go
throught to the door framing.
The door can be hung on either the
left or right side.
Step 3
1
4
1mm
30mm
screw
31x30mm Screws
12
Fix Pad Bolt with 6x 30mm Black
Screws to horizontal brace to the
Door.
Then fix the pad bolt retainer to
the Door framing using 4x30mm
Screws
11
Step 4
Fix the corners with 50mm
screws as shown in diagram.
Do not secure the building to the
floor until the roof is fitted. Fix
the panels onto the floor using
50mm screws in alignment with
the floor joists
8 x 50mm screws
5
50mm
screw
2
3
Step 5
Fix door gable and Plain sides
using same method shown in
step 6.
Position the panels so there is
equal spacing between the floor
and cladding on all four sides.
14 x 50mm screws
3
1
50mm
screw