background image

Valtis Ogrevanje d.o.o.

 

  Instructions for installers and maintenance workers

 

 

Characteristics of the boiler 

VIVA GT 25 

VIVA GT 35 

Unit 

Boiler weight 

596 

596 

kg 

The volume of water in the boiler 

184 

184 

Fuel storage tank volume 

135 

135 

Dimensions of the fuel inlet 

350 x 430 

350 x 430 

mm 

Max. operating pressure 

bar 

Maximum temperature hot water duck 

85 

85 

°C

 

Minimum return temperature 

55 

55 

°C

 

Fuel consumption 

6.21 / NP 

8.54 / NP 

kg/h 

*Efficiency (EN 303-5:2012) 

90.50 

90.80 

Thermal output  

24.81 

34.19 / NP 

kW 

Output range 

rated output only 

rated output only 

kW 

Boiler connection voltage 

230 / 50 

230 / 50 

V/Hz 

Required chimney draft 

10 - 15 

10 - 15 

Pa 

Fumes temperature 

100-200 

100-200 

°C

 

Test pressure 

4.5 

4.5 

bar 

Boiler class (EN303-5:2012) 

Combustion period 

2 - 6 

Boiler water settings 

70 - 85 

70 - 85 

°C

 

Fumes flow 

0.0146 / NP 

0.0185 / NP 

kg/s 

Water resistance (∆t=10K)

 

102 

160 

mbar 

Water resistance (∆t=20K)

 

25 

47 

mbar 

Hot water reservoir 

1000 

1500 

Protection water temperature and 
pressure 

20 / 2 

20 / 2 

°C /

 bar 

Diameter of the chimney connection 

130 

130 

mm 

Electrical power 

59 / NP / 3 

64 / NP / 3 

Noise emission 

> 70 

> 70 

db(A) 

Condensing boiler 

no 

no 

Operation at excess or negative pressure 

negative pressure 

negative pressure 

Operation with or without fan 

with fan 

with fan 

 

 

Содержание Viva GT

Страница 1: ...Valtis ogrevanje d o o Cesta k Tamu 61 2000 Maribor Manual for Maintenance Workers Viva GT V_06032020...

Страница 2: ...Fume extraction duct 2 Combustion chamber 3 Loading bay door 4 Ash cleanout doors 5 Smoke chamber cover 6 Firewood storage 7 Belimo air intake motors 8 Boiler heat exchanger 9 Fan 10 Chimney connectio...

Страница 3: ...mixing valve 5 4 with motor drive e g PROMIX AVC05 5Nm 2 min 230V and flow pumps 25 60 180 or the exact equivalent of the one described The diameter of the pipe between the boiler and the water stora...

Страница 4: ...p 4 Thermal discharge safety device 5 Visible outflow into the canal INSPECTION OF THE CORRECT INSTALLATION OF THE STS SAFETY VALVE MINIMUM WALL CLEARANCE In order for the manufacturer to ensure troub...

Страница 5: ...OFF is displayed on the top screen To get to the parameter change menu you must first unlock the electronics The procedure for unlocking the electronics is as follows 1 Hold the bottom right button no...

Страница 6: ...tects a fire in the firebox it starts to regulate both flaps In the first stage the primary air flap will be almost fully open it must reach a fume temperature of 180 C When the boiler reaches an oper...

Страница 7: ...n the lower layer The smaller the material the less you can mix in Inappropriate fuels Moist fuels with more than 20 water are not allowed They cause water to accumulate corroding the walls of the boi...

Страница 8: ...output only rated output only kW Boiler connection voltage 230 50 230 50 V Hz Required chimney draft 10 15 10 15 Pa Fumes temperature 100 200 100 200 C Test pressure 4 5 4 5 bar Boiler class EN303 5...

Страница 9: ...llers and maintenance workers CONNECTING THE BOILER TO THE ELECTRICITY GRID The connection of the boiler to the electricity grid and the input output components valves pump sensors is done via the ter...

Страница 10: ...connect the electrical voltage We take into account that the water in the boiler should be below 30 C 1 Place the fume sensor in the correct position Keep him in the cocoon deep in the ribs 2 Insert t...

Страница 11: ...ecessary to know that the boiler temperature must be below 30 C Once this operation is finished the process is complete When it comes to this version of the program it is important to note that The La...

Страница 12: ...cally check the sensor the suitability of the insulation Change the sensor Displayed when the regulation has not detected a fume sensor Check the connection where the sensor is connected Physically ch...

Страница 13: ...the area below the heat exchanger Clogged chimney Try to change the activation of heating pumps with external control Clean the walls of the boiler Clean the heat exchanger Clean the ash in the area...

Страница 14: ...ELOW THE REGISTER Clean the chamber walls Clear the ashes INSPECTION OF DOORS AND COVERS Inspection of insulation inserts Inspection and replacement of the sealing cord Check for leaks INSPECTION OF C...

Отзывы: