background image

S-Cape

 2MR Hand Control Operation Guide 99300906

The three step procedure below is required to program 2 hand controls to operate 1 bed.
Before beginning, make certain the bed is plugged into a working grounded electrical outlet.

If programming fails, initiate the programming procedure a second time.

S-CAPE

 2MR PROGRAMMING  

2 hand controls - 1 bed

POS 1

BUTTON

TRANSMISSION
INDICATOR
LIGHT

FIGURE 3

HEAD MASSAGE

ON/OFF

BUTTON

STEP 1

The bed will be equipped with either a

power down box

 or 

J box

 receiver unit

(

FIGURE 2

). Locate the receiver unit for the

bed and press the 

learn button

 for 1 second

and release. 

Note: If you experience

difficulty locating or reaching the learn
button on a J box equipped adjustable bed,
refer to

 J Box Programming

 on page 5.

STEP 2

On hand control 1, simultaneously press
and hold the 

POS 1 

and the 

head massage

on/off buttons

 (

FIGURE 3

). 

The

transmission indicator light will 

flash

slowly

 and then 

flash rapidly

 to indicate

programming mode.

 Continue to hold for 5

seconds and then release the buttons.

HAND

CONTROL 1

HAND

CONTROL 2

STEP 3

Repeat Step 1 and Step 2 with hand control
2.

Two hand controls are now programmed to
operate one bed.

J BOX

FIGURE 2: Power down box and J box receiver units.

LEARN
BUTTON

LEARN
BUTTON

POWER
DOWN BOX

POWER DOWN
BOX RECEIVER
UNIT IS NOT
MOUNTED TO
BED FRAME.

J BOX RECEIVER
UNIT IS MOUNTED
TO THE BOTTOM
SIDE OF THE
BED FRAME.

7

NOTE

OPERATE ONLY ONE (1) HAND CONTROL AT A
TIME. OPERATING TWO (2) HAND CONTROLS
AT THE SAME TIME WILL MOMENTARILY
BLOCK BOTH RF SIGNALS AND PREVENT BOTH
CONTROLS FROM FUNCTIONING.

Содержание S-cape 2MR

Страница 1: ...99300906 EDR10731 7 06 OPERATION GUIDE www adjustablesbyleggett com S cape 2MR S cape 2MR hand control hand control TM ...

Страница 2: ......

Страница 3: ... 5 S cape 2MR Programming 1 hand control 1 bed 6 S cape 2MR Programming 2 hand controls 1 bed 7 S cape 2MR Programming 1 hand control 2 beds 8 S cape 2MR Programming 2 hand controls 2 beds 9 S cape 2MR Reprogramming separating 2 beds 10 Copyright 2006 Leggett Platt Inc CONTENTS ...

Страница 4: ...intensity WAVE SPEED BUTTONS Press and hold after the head and or foot massage and the wave system have been activated to increase or decrease the wave speed HEAD MASSAGE ON OFF BUTTON Switches the head massage on or off When switched on the massage feature will automatically shut off after 30 minutes WAVE ON OFF BUTTON Press to activate or deactivate the wave vibration system CUSTOM POSITION RECA...

Страница 5: ...nated disconnecting and reconnecting the electrical power cord will achieve the same function Note that this alternate programming feature is only applicable to beds without a power down box Power down equipped adjustable beds require use of the learn button when programming the hand control POWER DOWN BOX OPERATION In case of a power outage press and hold the learn button on the power down box to...

Страница 6: ...ce difficulty locating or reaching the learn button on a J box equipped adjustable bed refer to J Box Programming on page 5 STEP 2 On the hand control simultaneously press and hold the POS 1 and head massage on off buttons FIGURE 3 The transmission indicator light will flash slowly and then flash rapidly to indicate programming mode Continue to hold for 5 seconds and then release the buttons One h...

Страница 7: ... on a J box equipped adjustable bed refer to J Box Programming on page 5 STEP 2 On hand control 1 simultaneously press and hold the POS 1 and the head massage on off buttons FIGURE 3 The transmission indicator light will flash slowly and then flash rapidly to indicate programming mode Continue to hold for 5 seconds and then release the buttons HAND CONTROL 1 HAND CONTROL 2 STEP 3 Repeat Step 1 and...

Страница 8: ...button for 1 second and release Note If you experience difficulty locating or reaching the learn button on a J box equipped adjustable bed refer to J Box Programming on page 5 BED1 BED2 STEP 3 Repeat Step 1 and Step 2 with bed 2 One hand control is now programmed to operate two beds J BOX FIGURE 2 Power down box and J box receiver units LEARN BUTTON LEARN BUTTON POWER DOWN BOX POWERDOWN BOX RECEIV...

Страница 9: ... equipped with either a power down box or J box receiver unit FIGURE 2 Locate the receiver unit for bed 1 and press the learn button for 1 second and release Note If you experience difficulty locating or reaching the learn button on a J box equipped adjustable bed refer to J Box Programming on page 5 STEP 2 On hand control 1 simultaneously press and hold the POS 1 and the head massage on off butto...

Страница 10: ...ttons STEP 6 Repeat Step 4 and Step 5 with hand control 2 Independent hand control operation is now restored hand control 1 operating bed 1 hand control 2 operating bed 2 STEP 2 On hand control 1 simultaneously press and hold the POS 1 and the head massage on off buttons FIGURE 3 The transmission indicator light will flash slowly and then flash rapidly to indicate programming mode Continue to hold...

Страница 11: ......

Страница 12: ...www adjustablesbyleggett com For customer care online email accustomerservice leggett com ...

Отзывы: