Wallbox PULSAR Скачать руководство пользователя страница 5

DE

Wichtige Hinweise

PT

Notas importantes

NL

Belangrijke opmerkingen

SV

Viktigt att tänka på

FR

Remarques importantes

CA

Notes importants

IT

Note importanti

ES

4.

 Make sure to update your charger with the latest software version before installing the meter.

5.

 Ensure the charger is powered off before connecting the meter.

6.

 A Standard of Business myWallbox license is needed. 

7.

 For more information, refer to your charger’s guide on Wallbox Academy.

4.

 Make sure to update your charger with the latest software version before installing the meter.

5.

 Ensure the charger is powered off before connecting the meter.

6.

 A Standard of Business myWallbox license is needed. 

7.

 For more information, refer to your charger’s guide on Wallbox Academy.

4.

 Make sure to update your charger with the latest software version before installing the meter.

5.

 Ensure the charger is powered off before connecting the meter.

6.

 A Standard of Business myWallbox license is needed. 

7.

 For more information, refer to your charger’s guide on Wallbox Academy.

4.

 Make sure to update your charger with the latest software version before installing the meter.

5.

 Ensure the charger is powered off before connecting the meter.

6.

 A Standard of Business myWallbox license is needed. 

7.

 For more information, refer to your charger’s guide on Wallbox Academy.

4.

 Make sure to update your charger with the latest software version before installing the meter.

5.

 Ensure the charger is powered off before connecting the meter.

6.

 A Standard of Business myWallbox license is needed. 

7.

 For more information, refer to your charger’s guide on Wallbox Academy.

4.

 Make sure to update your charger with the latest software version before installing the meter.

5.

 Ensure the charger is powered off before connecting the meter.

6.

 A Standard of Business myWallbox license is needed. 

7.

 For more information, refer to your charger’s guide on Wallbox Academy.

4.

 Make sure to update your charger with the latest software version before installing the meter.

5.

 Ensure the charger is powered off before connecting the meter.

6.

 A Standard of Business myWallbox license is needed. 

7.

 For more information, refer to your charger’s guide on Wallbox Academy.

4.

 Make sure to update your charger with the latest software version before installing the meter.

5.

 Ensure the charger is powered off before connecting the meter.

6.

 A Standard of Business myWallbox license is needed. 

7.

 For more information, refer to your charger’s guide on Wallbox Academy.

4.

 Make sure to update your charger with the latest software version before installing the meter.

5.

 Ensure the charger is powered off before connecting the meter.

6.

 A Standard of Business myWallbox license is needed. 

7.

 For more information, refer to your charger’s guide on Wallbox Academy.

Notas importantes

NO

Viktige merknader

Содержание PULSAR

Страница 1: ...Manual DYNAMIC POWER SHARING...

Страница 2: ...charger following the instructions listed in the charger s Installation Guide Only energy meters delivered by Wallbox are compatible Installation must be performed by qualified personnel only accordin...

Страница 3: ...nel only according to local regulations 1 Install the charger following the instructions listed in the charger s Installation Guide 2 Only energy meters delivered by Wallbox are compatible 3 Installat...

Страница 4: ...t software version before installing the meter Ensure the charger is powered off before connecting the meter A Standard of Business myWallbox license is needed For more information refer to your charg...

Страница 5: ...n Wallbox Academy 4 Make sure to update your charger with the latest software version before installing the meter 5 Ensure the charger is powered off before connecting the meter 6 A Standard of Busine...

Страница 6: ...chargers All models except Pulsar and Quasar 1 5 Communication protocol between Primary charger and Power Meter Modbus RTU 3 Quantity of Energy Meters 1 2 Quantity of Secondary Chargers All chargers 1...

Страница 7: ...except Pulsar 2 Quantity of Secondary Chargers 3 Quantity of Energy Meters 4 Communication protocol between chargers 5 Communication protocol between Primary charger and Power Meter 1 Quantity of Prim...

Страница 8: ...rimary charger and Energy Meter 500m 9 Configurable maximum phase current Charging network MCB 6 Maximum Total length of charging network 250m 8 Terminating Chargers 2 10 Configurable installation max...

Страница 9: ...6 Maximum Total length of charging network 7 Maximum lenght between Primary charger and Energy Mete 8 Terminating Chargers 9 Configurable maximum phase current 10 Configurable installation maximum cur...

Страница 10: ...s Devices Commander Commander 2 Copper C Copper SB Torx T20 Copper SB D Torx T9 Pulsar Plus Commander 2 C Primary Meter Cable STP Class 5E 500m Max Length F Connecting Cable UTP CAT 5E 250m Max Length...

Страница 11: ...erial och verktyg FR A Destornillador Philips B Alicates de corte C Torx T9 D Torx T20 E Pelacables F Cable recomendado STP clase 5E longitud m xima 500 m Mat riaux et outils CA A Tornav s Philips B A...

Страница 12: ...ing Power off and carefully open all the connected chargers Perform the steps listed in the section Installation of charging network of this manual Follow the instructions for opening the charger in t...

Страница 13: ...carefully open all the connected chargers 2 Perform the steps listed in the section Installation of charging network of this manual Follow the instructions for opening the charger in the charger s ins...

Страница 14: ...fully open only the primary charger Follow the instructions for opening the charger in the charger s installation guide Perform the steps listed in the Cabling network section of this manual For more...

Страница 15: ...chargers Follow the instructions for opening the charger in the charger s installation guide 2 Perform the steps listed in the section Installation of charging network of this manual 3 For more detai...

Страница 16: ...he chargers in a chain one charger is connected to the next one Chargers at the beginning and end of the chain must be configured as Terminating T chargers Chargers between the terminating chargers mu...

Страница 17: ...a chain one charger is connected to the next one 2 Chargers at the beginning and end of the chain must be configured as Terminating T chargers 3 Chargers between the terminating chargers must be conf...

Страница 18: ...the position of a switch on the control board Only for Pulsar and Commander A specific Part Number must be specified when ordering the unit NT option is Indicated with a P in the Part Number WBXX X X...

Страница 19: ...a switch on the control board 2 Pre defined Factory Setting 3 Only for Pulsar and Commander A specific Part Number must be specified when ordering the unit Indicated with a P in the Part Number WBXX...

Страница 20: ...nergy meter 1 Install the Primary charger according to the Installation Guide and connect it to the energy meter 2 Connect the secondary chargers as described in the Installation section of this manua...

Страница 21: ...ircuits Follow the manufacturer s instructions to install the energy meter 2 Install the Primary charger according to the Installation Guide and connect it to the energy meter 3 Connect the secondary...

Страница 22: ...the energy meter according to the diagram in the following page 1 E Wallbox Meter F Communication I Wallbox Master I Building Loads J Charging Installation G RCDs MCBs D Fuse Box B Utility Meter A Gri...

Страница 23: ...ity Meter C Main Switch D Fuse Box A Grid B Utility Meter C Main Switch D Fuse Box A Grid B Utility Meter C Main Switch D Fuse Box A Grid B Utility Meter C Main Switch D Fuse Box A Grid B Utility Mete...

Страница 24: ...GND Connection with Energy Meter Carlo Gavazzi EM340 EM112 EM330 D D RS485 NT T Commander 2 12V GND D D Temco SPM1 100 AC...

Страница 25: ...Commander Connection with Energy Meter Carlo Gavazzi EM340 EM112 EM330 Temco SPM1 100 AC D D GND GND D D 12 V...

Страница 26: ...Connection with Energy Meter Copper SB Rev A GND D D Temco SPM1 100 AC GND 12V D D Carlo Gavazzi EM340 EM112 EM330...

Страница 27: ...Connection with Energy Meter D D Carlo Gavazzi EM340 EM112 EM330 GND RS485 T NT Copper SB Rev B 12V GND D D Temco SPM1 100 AC...

Страница 28: ...1 2 3 4 5 6 7 8 9 0 RS485 T NT 12V GND D D Temco SPM1 100 AC Pulsar Plus GND D D Carlo Gavazzi EM340 EM112 EM330 Connection with Energy Meter...

Страница 29: ...Copper C GND D D Temco SPM1 100 AC GND 12V D D Carlo Gavazzi EM340 EM112 EM330 Connection with Energy Meter...

Страница 30: ...4 15 12 16 17 2 3 N 1 7 8 10 11 12 9 N N 1 2 3 4 5 6 3 4 5 6 7 8 N N 1 2 For Carlo Gavazzi meters please follow the meter s manual included in the box EM 112 EM 330 EM 340 EM 340 3 Phase 65 A EM 112 1...

Страница 31: ...1 Dans le cas des compteurs Carlo Gavazzi veuillez suivre le manuel du compteur inclus dans la bo te EM 112 1 Phase 100 A EM 330 3 Phase 65 A EM 340 3 Phase 65 A Energy Meter CA 1 Per als comptadors...

Страница 32: ...Energy Meter EM 340 7 9 8 10 A T D RS485B B D RS485A GND GND EM 340 Wallbox 7 8 10 11 12 9 N N 1 2 3 4 5 6...

Страница 33: ...Energy Meter EM 112 3 4 5 6 7 8 N N 1 2 3 5 4 6 A T D RS485B B D RS485A GND GND EM 112 Wallbox...

Страница 34: ...RS485A GND GND EM 330 Wallbox 250 A 600 A CTA 5 X CTD 6S 24 mm 3 50 mm 3 2 Amperage limit 3 Transformer 4 Hole diameter 5 Number of Transformers 400 A CTA 6 X 36 mm 3 EM 330 requires the following cur...

Страница 35: ...ng system 1 EM 330 requires the following current transformers based on the amperage limit and the characteristics of the cabling system 1 EM 330 requires the following current transformers based on t...

Страница 36: ...1 2 3 4 5 6 Temco SPM1 100 AC Used for 1 Phase installation Up to 100A Clip the power meter to the mains power cable Neutral cable must not be drawn through the clamp 1 2 3...

Страница 37: ...Temco SPM1 100 AC FR 1 Used for 1 Phase installation Up to 100A 2 Clip the power meter to the mains power cable 3 Neutral cable must not be drawn through the clamp Temco SPM1 100 AC CA 1 Used for 1 Ph...

Страница 38: ...1 2 3 4 5 6 Temco SPM1 100 AC 12 V GND RS485 RS485 CURRENT DIRECTION CABLE...

Страница 39: ...3 4 5 6 RS485 D RS485B RS485 Power D RS485A Power GND 12V Voltage Voltage 2 1 SPM1 100 AC Wallbox Electrical Wiring...

Страница 40: ...ction is done inside the charger T Connection Copper Copper SB Rev A NT Connection Copper Copper SB Rev A NT Connection Pulsar Plus Commander 2 Copper SB Rev B T Connection Pulsar Plus Commander 2 Cop...

Страница 41: ...he charger Cabling Network FR 1 Copper Commander 2 and Pulsar Plus have two slots for input and output cabling so the conjunction is done inside the charger Cabling Network CA 1 Copper Commander 2 and...

Страница 42: ...Connection between chargers Commander 2 CAN H CAN H CAN L CAN L T Connection NT Connection CAN NT T...

Страница 43: ...Connection between chargers CAN T NT Copper SB Rev B CAN H CAN H CAN L CAN L T Connection NT Connection...

Страница 44: ...1 2 3 4 5 6 7 8 9 0 CAN T NT CAN H CAN H CAN L CAN L T Connection NT Connection Connection between chargers Pulsar Plus...

Страница 45: ...CAN L CAN L CAN H CAN H T Connection NT Connection CAN T NT Connection between chargers Copper C Copper SB Rev A...

Страница 46: ...CAN H CAN L T Connection Commander Connection between chargers...

Страница 47: ...1 2 3 4 5 6 7 8 9 0 Pulsar CAN L CAN H T Connection Secondary only con nection...

Страница 48: ...ndary chargers Configure the rotary switch for each charger to configure its role 0 Pulsar Commander Copper Secondary Position Charger Configuration Primary Secondary 8 9 Pulsar Plus Commander 2 Coppe...

Страница 49: ...haring network consists of one primary charger and up to 24 secondary chargers 2 Configure the rotary switch for each charger to configure its role 3 Any other Stand alone Check the chargers Installat...

Страница 50: ...mary charger can be configured from the Wallbox app or touchscreen interface for Commander family chargers A Standard or Business account is needed to configure this functionality For more information...

Страница 51: ...be configured from the Wallbox app or touchscreen interface for Commander family chargers 3 A standard or business account is needed to configure this functionality For more information see the corres...

Страница 52: ...be supplied to the charging network This value is usually the rated current of the MCB Minimum current per charger From 6 A to 10 A The default value is 6 A Mains Breaker Maximum current The maximum c...

Страница 53: ...d to the charging network This value is usually the rated current of the MCB 3 Minimum current per charger From 6 A to 10 A The default value is 6 A 4 The maximum current that can be supplied to the e...

Страница 54: ...Configuration Touchscreen Interface 1 Commander In the configuration menu 2 Commander 2 In the configuration menu Settings System Dynamic Power Sharing Settings Dynamic Power Sharing...

Страница 55: ...mander In the configuration menu Settings System Dynamic Power Sharing 1 Commander In the configuration menu Settings System Dynamic Power Sharing 1 Commander In the configuration menu Settings System...

Страница 56: ...onfiguration Wallbox App All the primary chargers can be configured through the Wallbox App Once connected and synchronized with the charger access through Configurations Menu Dynamic Power Sharing 1...

Страница 57: ...1 All the primary chargers can be configured through the Wallbox App 2 Once connected and synchronized with the charger access through Configurations Menu Dynamic Power Sharing Configuration Wallbox A...

Страница 58: ...5 89 87 87 15 Danmark 49 69 96759775 Deutschland 34 932 20 95 75 Espa a France 33 1 76 46 09 15 353 14 854 347 Ireland 39 011 1962 2461 Italia 31 20 808 0847 Nederland Norge 47 51 74 20 00 351 308 801...

Страница 59: ......

Страница 60: ...support wallbox com...

Отзывы: