
New Installation
Positioning the chargers
The Primary charger communicates
with the Secondary chargers through
a cabling system that connects the
chargers in a chain: one charger
is connected to the next one.
Chargers at the beginning and end
of the chain must be configured
as Terminating (T) chargers
Chargers between the terminating
chargers must be configured as non-
terminating (NT) chargers
Each charger includes an electric
element that defines whether it is a T
or NT charger
1.
2.
3.
4.
Содержание PULSAR
Страница 1: ...Manual DYNAMIC POWER SHARING...
Страница 25: ...Commander Connection with Energy Meter Carlo Gavazzi EM340 EM112 EM330 Temco SPM1 100 AC D D GND GND D D 12 V...
Страница 29: ...Copper C GND D D Temco SPM1 100 AC GND 12V D D Carlo Gavazzi EM340 EM112 EM330 Connection with Energy Meter...
Страница 32: ...Energy Meter EM 340 7 9 8 10 A T D RS485B B D RS485A GND GND EM 340 Wallbox 7 8 10 11 12 9 N N 1 2 3 4 5 6...
Страница 33: ...Energy Meter EM 112 3 4 5 6 7 8 N N 1 2 3 5 4 6 A T D RS485B B D RS485A GND GND EM 112 Wallbox...
Страница 38: ...1 2 3 4 5 6 Temco SPM1 100 AC 12 V GND RS485 RS485 CURRENT DIRECTION CABLE...
Страница 42: ...Connection between chargers Commander 2 CAN H CAN H CAN L CAN L T Connection NT Connection CAN NT T...
Страница 43: ...Connection between chargers CAN T NT Copper SB Rev B CAN H CAN H CAN L CAN L T Connection NT Connection...
Страница 46: ...CAN H CAN L T Connection Commander Connection between chargers...
Страница 47: ...1 2 3 4 5 6 7 8 9 0 Pulsar CAN L CAN H T Connection Secondary only con nection...
Страница 59: ......
Страница 60: ...support wallbox com...