Installing the Drive on Gate Post
1-2
Rev:
A
Installing the Kinetic Operator on Gate Posts
RH & LH mounting options can be configured by the following steps:
1)
Remove the 4 - 10x1.5 x 20mm button head screws on the side of the operator that will be
mounted to the gate post. See Figure
1-2. Discard the screws.
2)
a) Place the Spacers between the operator and gate post, align the spacers with the mounting
holes.
b) Slide the clamps over the gate post.
c) Insert and tighten the 4 – 10x1.5 x 140mm hex bolts to secure the operator to the gate post.
See Figure
1-3.