Installer’s Check List
Intro-4 Rev:
A
Installer’s Check List
The following list provides a high level overview of the tasks involved in installing the Kinetic DC gate
operator. Take a moment to review the list and check off the items as you complete the install.
Make sure gate installation complies with ASTM F2200 Standard Specification for Automated Vehicular
Gate Construction. And, install the supplied WARNING sign on both sides of the gate.
Check for compliance with local codes, site conditions, and NEC standards.
Install tooth rack.
Install operator - (on gate post using 10x1.5 x 140mm hex bolts, lock washers, clamps and spacers.)
Connect red wire to DC Power Switch.
Turn DC Power ON.
Complete Initial Setup Menu programming.
Install the target magnet and make sure it is in line with and passes by the target sensor so it can be
recognized by the software programming.
Connect
AC
Power.
Connect all accessory devices.
Set the Close Timer (through the User Menu).
Set gate speed, if applicable (through Installer Menu). Refer to START (
Smart Touch Analyze and Retrieve
Tool
) in the
Reference
section.
Set IES sensitivity, if needed (through Installer Menu).
Check the Smart DC Controller software version. If needed, upload the latest version from
www.hysecurity.com
. See
Smart Touch Analyze and Retrieve Tool
.
Program changes through the Installer Menu depending on the accessory devices that you have installed.
Give a copy of the operator instructions to the end user. Show the end user how to:
• Remove the operator cover. Turn the power o_ and on to demonstrate learn limits after DC/AC cycles.
• Turn the DC power switch off, which disengages the motor, and manually push the gate.
• Test the red Emergency Stop Button located on the side of the control box. It can be accessed through a
hole in the cover. See illustration on page S-8.
Take photographs of the completed installation site and save it in your business files.