Operating manual Pneumatic double diaphragm pump ZIP52 (PF Eco) Finishing
6 Assembly and Commissioning
28
Order number 2332848 | Edition 08/2020
6 ASSEMBLY AND COMMISSIONING
6.1 TRAINING OF ASSEMBLY/COMMISSIONING PERSONNEL
– The assembly and commissioning personnel must have the technical skills to safely
commission the device.
– When assembling, commissioning and carrying out all work, read and follow the
operating manuals and safety regulations for the additionally required system
components.
A skilled person must check to ensure that the device is in a reliable state after it is
assembled and commissioned.
6.2 STORAGE CONDITIONS
Until the point of assembly, the device must be stored in a dry location, free from vibrations
and with a minimum of dust. The device must be stored in closed rooms.
The air temperature at the storage location must be between -20 °C and +60 °C (-4 °F and
+140 °F).
The relative air humidity at the storage location must be between 10 and 95% (without
condensation).
6.3 INSTALLATION CONDITIONS
The air temperature at the installation site must be in a range between 0 °C and 40 °C; 32 °F
and 104 °F.
The relative air humidity at the installation site must be between 10 and 95% (without
condensation).
6.4 TRANSPORTATION
The pump can be moved on a trolley or manually without lifting equipment or a crane.
6.5 ASSEMBLY AND INSTALLATION
WARNING
Inclined ground!
Risk of accidents if the device rolls away/falls.
4
Position the trolley with the double diaphragm pump horizontally.
4
If the floor is inclined, position the feet of the trolley towards the gradient.
4
Secure the trolley.
Positioning
××
B_06944