![WAGNER FinishControl 6500 TS Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/wagner/finishcontrol-6500-ts/finishcontrol-6500-ts_operating-manual_868247029.webp)
23
FinishControl 6500 TS
GB
Unscrew the container from the spray attachment.
2.
Pour in the prepared coating material.
3.
Fill the container
with maximum
600 ml.
600ml
Fit the appropriate filter to the feed tube depending on the
4.
coating material used (Fig. 10, 1)
Low-viscosity coating materials
Fine filter (red)
Viscous coating materials
Coarse filter (white)
WArnIng: check that the mixer is mount-
ed in the container. If the mixer is not in
place the paint can harden in the contain-
er during the heating process.
5. Screw the container firmly onto the spray attachment.
Plug in the power cable.
6.
Switch on the main switch at the device.
7.
the paint can only be heated on the heating
station with the tempSpray attachment.
If you do not want to heat the paint, or if you
do not want to use the tempSpray attachment,
skip sections 8-12.
Warning: risk of injury from mixer! the
heating and cleaning procedures may
only be carried out when the container is
closed.
8. Place the spray attachment (without mounted gun handle)
on the heating station.
Both yellow control lamps flash alternately
when a function test is being carried out.
If an error is detected, both control lamps flash
at the same time (for possible error sources,
see „correction of Malfunctions“).
If everything is ok, the preset temperature of
30°c lights up.
If necessary, press the “50°C” button to adjust the target
9.
temperature.
Press the “Heat” button to start the heating process.
10.
The red control lamp, “Heating” starts to light up and the
mixer rotates in the container.
As soon as the set temperature has been reached, the green
11.
control lamp - “Spray/Clean” lights up.
Remove the spray attachment from the heating station.
12.
Connect spray attachment and gun handle. (Fig. 3)
13.
The device is now ready for operation.
10
SPrAyIng technIque
The FinishControl has a trigger with 2 pressure
points. In the first stage the turbine is started. If
the trigger is pressed further, the material is trans-
ported.
Operate trigger on the spray gun.
Test spray a piece of cardboard to ensure correct setting of the
spray pattern, spray jet width, material and air volume.
Hold the paint spray gun upright and maintain a constant
distance of about 3 - 20 cm to the object being sprayed. (Fig.
11)
Move the paint spray gun evenly either from side to side or up
and down. If the gun is moved evenly, it will produce an even
surface finish.
Always start spraying away from the object and avoid stop-ping
spraying whilst still on the object.
In case of excessive paint mist formation, adjust the air and
material flow respectively and alter the distance from the
object.
11
BreAkS In Work
1. Switch device off with main switch on the basic unit.
2. Place the spray attachment with mounted gun handle on
the heating station.
The paint cools down to about 5°C in 30 minutes
(depending on the ambient temperature). In the
event of longer interruptions, heat the paint up
again when you start work.
In using quick-drying or two-component coating
materials, do not fail to rinse unit through with
a suitable cleaning agent during the processing
period.
Important: The application life of the material can
change as a result of heating. Therefore, please
consult the material manufacturer.
12
trAnSPortAtIon
Coil power cable around the basic unit.
1.
Place the spray attachment with mounted gun handle on
2.
the heating station.
Disconnect air hose by pressing the two side clips (Fig. 9).
3.
Roll up the air hose and tie up with the fixing straps.
4.
startIng oPeratIon/ sPrayIng technIque /Breaks In Work/
transPortatIon