background image

Sparky

’s wee sister has arrived!

She’s sweet and petite and clean air approved. 

Sparky CA

 is here to meet the urban 

demand for a compact, good looking small fire. She has streamlined panels incorporating a 
fixed log base and a stove top cooking surface which can be fitted with optional top rails. 
She loves to dress up so customised coloured panels are available and she even has her own 
tested petite flue system. 

Heat Output

Sparky CA

 generates a cosy 

7kw (estimated) heat output. 

Clean Air Approved

Emission: 0.55 g/kg
Efficiency: 68.15%.

Enduring Quality 

& Design

Sparky CA

 is New Zealand 

designed and handcrafted by 
Wagener Stoves using only the best 
quality materials with a special 
High Temperature paint finish.

Warranty

Sparky CAs

 firebox is 

covered by a 5 year warranty 
(Please refer to Installation & 
Operating Instructions for full 
details).

Buy with Confidence

Wagener Stoves have over 
40 years experience in the 
heating industry and have been 
members of the NZ Home 
Heating Association for over 
30 years.

Other Products 

Manufactured by 

Wagener Stoves

Wagener Stoves also design and 
manufacture “Lion” Wetbacks, the 
CookTop Wagener Stove, Butler 
Multi High Performance Hot Water 
Heaters, Traditional Style Slow 
Combustion Wagener Fairburn 
Cookers, Wagener Sparky and 
Wagener Leon.

WAGENER STOVES "LION" 

LTD

5 Allen Bell Drive, Kaitaia 0410

New Zealand

Phone: 09 408 2469

www.wagenerstoves.co.nz

At Wagener Stoves we are continually 

improving our products and therefore 

specifications and designs may change 

without prior notice

2019

• Cooking surface
• Optional top rails
• High temp paint finish
• Log base wood storage
• Colour options

Wagener

Sparky CA

Features include:

• Clean Air Approved
• Solid 5mm steel construction
• Brick lined firebox
• Removable baffles for easy cleaning  
• Ash hearth floor protector

 Minimum clearance to 

 Combustible Surfaces 

Requires Ash Hearth Floor Protector Only

Clean Air Approved

With stainless steel flue   

 

shield to unprotected wall    
As above 12mm 

Promina

 

board spaced 25mm off wall 
As above with sheet metal any 

type 0.5mm or thicker spaced 

25mm off the wall. 

Sheet metal as above 2 sheets 

spaced 12mmx12mm 

Other screening materials are available and clearance factors can be calculated to the AS/NZS 2918:2001.

Please ask your retailer or contact Wagener Stoves if you need further advice.

Installation Clearances

AS/NZ Standard 2918:2001

N E

W   Z

E A L A N D   M A D

E

WAGENER

100

370

370

797

797

865

485

460

540

340

797

865

160

Ashlip to screen

Door to screen

Stove only

Screen

370

157

120

100

610

TOP

TOP

G

B

C

D

F

Combustible Wall

A

1070

540

970

610

540

TOP

C

E

H

H

E

Installation Clearances as tested to AS/NZ Standard 2918:2001

3

A

B

C

D

E

F

G

H

100

260

300

120

100

257

445

330

40

76

Floor protection 

must extend under 

the stove and 

forward 300mm and 
200mm either side of 

the door opening.

40

197

261

270

30

78

30

187

263

260

30

52

30

187

237

258

Sparky 

RU

2021

865

WAGENER SPARKY RU - RURAL WOODBURNER

Содержание Sparky RU

Страница 1: ...staller s Responsibilities The Wagener Sparky RU must be installed in accordance with these installation instructions to comply with AS NZS 2918 2001 Domestic Solid Fuel burning appliances Any variati...

Страница 2: ...minimum size of 610mm wide and 865mm deep eg Tiles slate treadle plate etc The Ash Hearth floor protector shall have an upper surface including grouting if required of a durable non combustible mater...

Страница 3: ...001 Please ask your retailer or contactWagener Stoves if you need further advice Installation Clearances AS NZ Standard 2918 2001 WAGENER 100 370 370 797 797 865 485 460 540 340 797 865 160 Ashlip to...

Страница 4: ...E PIPE 150MM INNER CASING CEILING PLATE CERAMIC CEILING SPACER NOGGING Ash Hearth Floor Protector 100mm Flue Pipe Flue Flange Flue Shield Flue collar panel WAGENER Sparky RU 4 2 Metres from above flue...

Страница 5: ...proposed position and mark a point on the ceiling that is directly above the centre of the Woodburners Flue Spigot Check that the Woodburners location allows the OUTER CASING to clear all the structu...

Страница 6: ...e bottom FLUE PIPE securing the 3 Monel rivets 10 Check that the FLUE PIPE SPACING BRACKETS inside the INNER CASING are correctly positioned and then from the roof slide the INNER CASING into the OUTE...

Страница 7: ...BREACHING AS NZS2918 2001 6 WARNING OPEN AIR CONTROLTO FULL AIR SUPPLY BEFORE OPENING FIRE DOOR 7 CAUTION THIS APPLIANCE SHOULD NOT BE OPERATED WITH A CRACKED GLASS 8 CAUTION THIS APPLIANCE SHOULD BE...

Страница 8: ...of the firebox Stack kindling around the newspaper like an Indian Tepee and light the newspaper or firelighters if using leaving the door slightly ajar until the kindling is well alight Then add 2 or...

Страница 9: ...causing damage Fire Box Bricks Fire Bricks serve two purposes Firstly to protect the steel chassis and secondly to maintain high temperatures in the fire box to effect complete combustion of the fuel...

Отзывы: