6 I Installation
WAFE 200 E INSTALLATION
Information in the following chapter assume that your WAFE 200 E unit will be installed
by certified WAFE service technician.
Any other form of installation without a previous agreement with WAFE s.r.o. may affect
the warranty on your device.
Planning the installation
Construction readiness
Purchase and delivery of WAFE 200 E is preceded by consulting the parameters of the construction
project with a responsible person.
Transportation and unpacking
When transporting the unit, be careful and bear in mind the principles of working with
heavy objects:
•
Make sure that the transport path and the place of rest are empty before
transporting the unit.
•
Do not carry the unit over long distances on your own without a
proper transportation aid.
•
While lifting the unit up bend your knees and keep your back
straight.
The unit has to be stored in a protective plastic casing
and in the original box until the moment of insta-
llation.
Содержание 200 E
Страница 1: ...USER MANUAL WAFE 200 E Energy Recovery Ventilation Unit v1 0...
Страница 2: ......
Страница 14: ...14 I Notes NOTES...
Страница 15: ...Pozn mky I 15...
Страница 16: ...16 I Notes...
Страница 17: ......