Proceed in reverse gear and the bucket will follow the profile of the ground spreading the
previously accumulated material.
DIGGING AND FILLING IN
DIGGING
The machine is not an excavator therefore digging is
only allowed on loose ground, without stones and
massesand which is generally easyto penetrate with
the shovel.
To start digging turn the shovel downward untilit
slightly touches the ground after which advance
slowly continuing to turn the shovel downwards until
it penetrates the ground.
Advance, turning the shovel slightly backwards until it is filled.
When the shovel has been filled, turn it backwards to contain all of the shovelled material, lift it
slightly and pull back to take it to the unloading area.
FILLING IN
Go to the area to be filled in at a moderate speed with the bucket turned downwards so that its
base makes an angle of about 45° with the ground.
In proximity of the area to be filled in, slightly
raise the lifting arms and turn the shovel
completely forward to unload all of the
previously accumulated material.
Pull back and repeat the operation until the ground has
been levelled.
Regarding loading capacity of the shovel, refer to the data supplied in the TECHNICAL
FEATURESAND DATA chapter. Do not overload the shovel.
An excessive load could cause loss of control or overturning of the machine with serious risks
for the operator.
Page
27
of
61
Item – Rev(s):
8009641121– 101
Содержание ST11
Страница 1: ...OPERATION MAINTENANCE MANUAL Compact Track Loader ST11 Item 8009641121 Revision Date 101 March 2022...
Страница 16: ...CONTROL AND AUXILIARY INSTRUMENTS CONTROL PANEL Fig 1 17 Page 16 of 61 Item Rev s 8009641121 101...
Страница 60: ...MAINTENANCE NOTES HOURS WORKED DATE WORK DONE PARTS CONCERNED Page 60 of 61 Item Rev s 8009641121 101...
Страница 61: ...MAINTENANCE NOTES HOURS WORKED DATE WORK DONE PARTS CONCERNED Page 61 of 61 Item Rev s 8009641121 101...