Operation
Shutting down
118
BA RC50_RC70 en 00
Drain and preserve the fuel system.
Fill the AdBlue®/DEF reservoir to 25%.
Check the coolant level and, if required, top it up.
Drain the engine oil and preserve the engine using running-in
preserving oil.
Check the gear oil level and, if required, top it up.
Drain the liquids from the tanks for water sprinkling, additive
sprinkling and the windscreen washer system.
Storage
Store the machine and machine components in well-ventilated,
lockable, temperature-controlled and dry rooms.
When storing outdoors, place the machine and machine components
on suitable underlays in order to protect them against moisture and
cover them using tarpaulins that open at the bottom. Secure the
tarpaulins using suitable lashings.
Recommissioning
Check the drive unit, auxiliary units, hoses, hose connections and
flange-mountings for leaks and/or escaping operating and auxiliary
materials. If there are any anomalies, repair or replace any affected
components.
Drain and dispose of the preserving liquids.
Fill pipe systems with operating and auxiliary materials e.g.: engine
coolant, engine oil, gear oil, AdBlue®/DEF, water sprinkling, additive
sprinkling.
Check and, if required, repair all of the components.
3.29.02
Permanently shutting down and disposing of the machine
WARNING
Dangerous operating materials!
Risk to health and the environment caused by operating materials that
have not been disposed of properly.
■
Dispose of operating materials in accordance with the applicable
safety and environmental regulations.
■
Wear personal protective equipment when disposing of the
materials.
If the machine is no longer designated or suitable for the intended use, it
must be decommissioned in accordance with the applicable regulations.
N
O
T
E
The work to permanently decommission the machine
requires expert knowledge and may require special tools and
equipment.
This work must only be carried out by trained specialists.
N
O
T
E
The work steps listed below are
NOT INSTRUCTIONS
. They
are a non-exhaustive list of examples of work that must be
carried out in order to permanently decommission the machine.
For precise information or for carrying out the
decommissioning, contact customer service.
Содержание RC50
Страница 10: ...EC Declaration of Conformity 10 BA RC50_RC70 en 00 EC DECLARATION OF CONFORMITY...
Страница 24: ...Preface Type plate 24 BA RC50_RC70 en 00...
Страница 41: ...Description General view of machine BA RC50_RC70 en 00 41 2 01 06 Consumable fill holes 1 1 Fuel...
Страница 49: ...Description Transmission BA RC50_RC70 en 00 49 2 06 Transmission 1 2 2 1 1 Travel drive motor 2 Scraper...
Страница 161: ...Tables Technical data BA RC50_RC70 en 00 161...
Страница 180: ...Tables Dimension sheet 180 BA RC50_RC70 en 00 5 02 Dimension sheet 5 02 01 RC50 5 02 02 RC50p...
Страница 181: ...Tables Dimension sheet BA RC50_RC70 en 00 181 5 02 03 RC70 RC70vo 5 02 04 RC70p...
Страница 219: ...Auxiliary equipment Padfoot shells BA RC50_RC70 en 00 219 Designation Value Unit Weight of rear scraper 70 kg...
Страница 220: ......
Страница 221: ......