![Wacker Neuson PV 35A Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/wacker-neuson/pv-35a/pv-35a_operators-manual_3326508022.webp)
PV 35A
Maintenance
wc_tx000755gb.fm
22
4.5
Head and Shaft Disassembly
See graphic: wc_gr005377
4.5.1
Disassembling the flexible casing and core:
4.5.1.1
Place the vibrator head assembly
(a)
in a vise equipped
with a set of “V” jaws.
4.5.1.2
Unscrew the casing assembly
(b)
from the vibrator head
assembly using a 32mm wrench or pipe wrench.
Note: Threads on the casing assembly are left-hand and require
uniform heat to remove.
4.5.1.3
Pull the casing assembly away from the head and core
assembly
(c)
.
4.5.1.4
Unscrew the core assembly from the head assembly using
a 12mm wrench or adjustable wrench.
Note: Use an additional wrench or pliers to hold the shaft joint (d) while
unscrewing the core assembly.
wc_gr005377
b
c
a
j
h
g
f
e
o
n
l
t
x
v
m
p
d
s
r
q
k
w
u
Содержание PV 35A
Страница 1: ...Handheld Gas Vibrator PV 35A OPERATOR S MANUAL 0171882en 002 0708 0 1 7 1 8 8 2 E N...
Страница 2: ......
Страница 9: ...Safety Information PV 35A wc_si000224gb fm 9 Notes...
Страница 10: ...PV 35A Safety Information wc_si000224gb fm 10 2 5 Label Locations wc_gr004853...
Страница 17: ...Operation PV 35A wc_tx000754gb fm 17 Notes...
Страница 29: ......