wc_tx004431gb_FM10.fm
67
LTV
Operation
Continued from the previous page.
Operating the
lights
Perform the procedure below to operate the lights.
1. Turn on the main circuit breaker
(a)
.
2. Turn on individual circuit breakers
(c)
one at a time.
Notes
■
Metal halide floodlights require a warm-up time of 5–15 minutes before they
reach full brightness.
■
After turning the lights off, a cool-down time of 10 minutes is necessary before
they can be turned on again.
Stopping the
machine
NOTICE:
Turn off the lights before stopping the engine. Failure to do so will
damage the electrical system.
Perform the procedure below to stop the machine.
1. Disconnect all loads from the machine.
2. Turn the circuit breakers
(a)
off.
3. Push the STOP button
(e)
to de-energize the fuel solenoid.
wc_gr013779
a
b
d
c
g
h
f
e
8K
Содержание LTV6L
Страница 8: ...Table of Contents LTV wc_bo5100030216_02_FM10TOC fm 8 ...
Страница 20: ...wc_si001039gb_FM10 fm 20 Labels LTV 2 Labels 2 1 Label Locations wc_gr013742 B D E C D E K L M F G H I J A N ...
Страница 21: ...wc_si001039gb_FM10 fm 21 LTV Labels wc_gr013743 W W V T U Q S ...
Страница 108: ......
Страница 110: ......