EHB 11
Maintenance
37
8
Maintenance
8.1
Maintenance schedule
WARNING
Improper handling can result in injury or serious material damage.
f
Read and follow all safety instructions of this operator's manual, see chapter
Safety information
.
Task
Daily be-
fore oper-
ation
Every
20 hrs.
Monthly
Check power cable for perfect
condition – if power cable is
defective, have it replaced. *
* Have the machine repaired by your WACKER representative.
Visual inspection of all parts
for damage.
Clean the machine.
Check shanks and cutting
edges of tool – sharpen, re-
forge or replace as needed.
Lubricate crank mechanism.
Check tool holder for wear –
have it changed, if
necessary. *
Содержание EHB 11 BLS
Страница 1: ...Operator s manual Electric hammer EHB 11 BL BLM BLS 0212727en 002 05 2008...
Страница 2: ......
Страница 17: ...EHB 11 Safety information 17 For all other machines Item Label Description 1 Sound power level...
Страница 50: ......
Страница 53: ......
Страница 54: ......