
CT 36 / CT 48
Operation
wc_tx000373gb.fm
27
3.14.6
To move to the right press down slightly on the handle (d).
3.14.7
Clean trowel after each use to remove concrete splatter.
Allow the muffler to cool before cleaning or servicing the machine. A
hot muffler could ignite the fuel and start a fire.
It is recommended that each set of work passes be at 90° to the
previous set of work passes. This will help prevent the creation of
valleys in the slab surface.
For example, in the illustration, the second set of work passes (2) is
90° to the first set of work passes (1).
Personnel other than the trowel operator should not be allowed in the
work area, as severe injury can occur from contact with operating
trowel blades.
Do not attempt to clean, service or perform adjustments on the trowel
while it is running.
WARNING
WARNING
1
2
wc_gr003239
a
b
c
d
Содержание CT 36
Страница 1: ...Trowel CT 36 CT 48 OPERATOR S MANUAL 0159226en 005 0408 0 1 5 9 2 2 6 E N...
Страница 2: ......
Страница 10: ...Safety Information CT 36 CT 48 wc_si000139gb fm 10 2 5 Label Locations...
Страница 19: ...CT 36 CT 48 Operation wc_tx000373gb fm 19 wc_gr001758 f g h j k m...
Страница 43: ...CT 36 CT 48 Maintenance wc_tx000374gb fm 43...
Страница 54: ......
Страница 55: ......
Страница 68: ...AEM_ConcretePowerTrowel qxd 7 23 03 6 31 AM Page 1...