![Wacker Neuson CT 36-400E Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/wacker-neuson/ct-36-400e/ct-36-400e_operators-manual_3136278026.webp)
Maintenance
CT 36-400E
26
3.
Maintenance
3.1
Periodic Maintenance Schedule
Inspect all electrical cords before each use and have damaged cords
replaced or repaired at an authorized service center.
Clean trowel after each use by flushing with water to remove concrete
splatters. DO NOT use a high pressure washer for the cleaning of
electrical equipment. The working tools must be thoroughly washed.
3.2
Trowel Lubrication
See Graphic: wc_gr001755
Grease trowel arms (b) with Shell Alvania RL2 grease or equivalent.
Oil the pitch control cable and other parts of trowel on an as needed
basis.
Oil in the gearbox should not require replacement unless it was
drained to service gearbox. Check quantity through plug (a) located on
side of gearbox. Oil level should be to bottom of the plug threads. See
Technical Data for oil quantity and type.
Daily
before
starting
After
first
20 hrs.
Every
50
hrs.
Every
100
hrs.
Check external hardware.
Grease cam followers.
Check drive belt.
WACKER NEUSON
Содержание CT 36-400E
Страница 1: ...Trowel CT 36 400E OPERATOR S MANUAL 0159491en 002 1108 0 1 5 9 4 9 1 E N ...
Страница 2: ......
Страница 4: ...Foreword wc_tx000001gb electric fm 4 ...
Страница 11: ...CT 36 400E Safety Information 11 1 4 Label Locations l o 2 l 2 l o o l l 2 l 2 o ...
Страница 25: ...CT 36 400E Operation 25 1 2 wc_gr003239 a b c d ...
Страница 32: ...Maintenance CT 36 400E 32 Notes ...
Страница 36: ......
Страница 37: ......
Страница 50: ...AEM_ConcretePowerTrowel qxd 7 23 03 6 31 AM Page 1 ...