
Lifting and Transporting
AD 75LGR
12
ghi_tx001193gb.fm
2
Lifting and Transporting
2.1
Lifting the Machine
Precautions
Refer to Chapter
Technical Data
for the applicable machine weights.
Obtain help from an assistant if necessary.
Lifting the
machine
Follow the procedure below to lift the machine.
1. Remove all water from the reservoir. See section
Flushing the Drainage System.
2. Disconnect the power supply. Wind the power cord
(a)
to the back of the machine.
3. Disconnect the outlet tube. Wind the outlet tube
(b)
to the back of the machine.
4.
For manual lifting:
Firmly grasp the handles of the machine and lift as needed.
For mechanically-aided lifting:
Attach a properly-rated strap to the upper handle
of the machine and to a properly-rated crane.
5. Lift the machine as needed.
Note:
The machine may be unbalanced when lifted. Take care when lowering the
machine so that it remains in the upright orientation.
ghi_gr006353
WARNING
Crush hazard. The machine could cause serious injury or death if the lifting mecha-
nism malfunctions.
f
Do not stand under the machine when it is being lifted.