BA 50Z3/6003 en – Edition 4.3 * 5003b340.fm
3-105
Operation
Locking
• Stop the engine.
• Insert tube
P
(included in scope of delivery) in clamping sleeve
Q
.
• Press the tube downward.
• The lock pin must be in position
R
.
Unlocking
• Stop the engine.
• Insert tube
P
(included in scope of delivery) in clamping sleeve
Q
.
• Press the tube upward.
• The lock pin must be in position
S
.
• Disengage lock mechanism
N
at the mounting bores
O
.
• Disengage coupling bar
M
at coupling claws
L
.
• Place the attachment on level ground.
Fig. 211: Bucket with quickhitch
Q
S
R
Содержание 50Z3
Страница 30: ...1 18 BA 50Z3 6003 en Edition 4 3 5003b110 fm Introduction 1 13 Signs and symbols Overview of adhesive labels ...
Страница 35: ...BA 50Z3 6003 en Edition 4 3 5003b110 fm 1 23 Introduction Overview of safety labels ...
Страница 56: ...2 16 BA 50Z3 6003 en Edition 4 3 5003b210 fm Safety instructions ...
Страница 178: ...3 122 BA 50Z3 6003 en Edition 4 3 5003b340 fm Operation ...
Страница 190: ...4 12 BA 50Z3 6003 en Edition 4 3 5003b410 fm Troubleshooting ...
Страница 254: ...5 64 BA 50Z3 6003 en Edition 4 3 5003b560 fm ...
Страница 265: ...BA 50Z3 6003 en Edition 4 3 5003b610 fm 6 11 Specifications 6 16 Dimensions model 50Z3 ...
Страница 267: ...BA 50Z3 6003 en Edition 4 3 5003b610 fm 6 13 Specifications 6 17 Dimensions model 50Z3 VDS ...
Страница 269: ...BA 50Z3 6003 en Edition 4 3 5003b610 fm 6 15 Specifications 6 18 Dimensions model 6003 standard boom Vario option ...
Страница 271: ...BA 50Z3 6003 en Edition 4 3 5003b610 fm 6 17 Specifications 6 19 Dimensions model 6003 triple articulation boom option ...