Wachs TSE 1.0 Скачать руководство пользователя страница 16

TSE TUBE SQUARING MACHINE

Machine Won't Run ..................... Power Unit Not Connected ...... Check Power Cord & Connection

Work Piece Shifts Under ............ Loose Collet Lock Nut .............. Tension Collet Lock Nut

Cutting Load

Poor Workpiece End Quality ......... Dull or Chipped Tool Bit ............ Replace Tool Bit

Machine Chatters During Cut ......... RPM Speed of Tool Head........... Refer to Section on Machining Tips

  is Set Too Fast or Feed Rate

  is Too Light

Chip Runs Up Workpiece I.D. ....... Improper Tool Bit Installation .... Refer to Tool Bit Installation Proce-

dure ( Section 5 )

Trouble

Possible Cause

Remedy

SECTION VIII

TSE TROUBLE SHOOTING

1

4

.

Содержание TSE 1.0

Страница 1: ...BSOLETE JAN 2017 Tube Squaring Machine Model TSE 1 0 i TUBE PIPE SQUARING MACHINES Mod TSE Ser No E H WACHS COMPANIES 100 Shepard St Wheeling Il 60090 Patent Pending Revised January 2017 E H Wachs 600...

Страница 2: ...TION III CE DECLARATION OF CONFORMITY 6 SECTION IV MACHINE SPECIFICATIONS 7 SECTION V SET UP OPERATING PROCEDURES 8 SECTION VI MAINTENANCE 11 SECTION VII OPERATIONAL CHARTS GRAPHS 12 SECTION VIII TROU...

Страница 3: ...TSE TUBE SQUARING MACHINE 1 TSE 1 0 with drive motor and cord T handle allen wrench 1 Tool bit Operating Instruction Manual Shipping Case SECTION I TSE ST ANDARD EQUIPMENT...

Страница 4: ...ce the chance for injury 6 KEEP WORK AREA CLEAR Be sure to keep the work area free of clutter and nonessential materials Only allow those personnel di rectly associated with the work being performed t...

Страница 5: ...ile consentire l accesso solamente al personale direttamente interessato nel lavoro svolto Findal1883 laEHWachssi guadagnataunareputazioneperquantoriguardaqualit eimpegnonellasoddisfazionedeiclienti I...

Страница 6: ...eia com o m ximo cuidado o que vai a seguir USE SEMPRE EQUIPAMENTO DE PROTEC O Sempre que trabalhar com esta ferramenta ou perto dela dever usar uma protec o para a vista provadechoque obrigat rio usa...

Страница 7: ...et jogsmykkerogvedatsamlelangt h roppe p hovedet 6 HOLD ARBEJDSSTEDET RYDDET Arbejdsstedet skal holdes ryddeligt og fri for materialer der ikkeh rertil Uvedkommendepersonerb rikkehaveadgang til arbejd...

Страница 8: ...s Used Other Safety Standards Used Name of person authorized to sign on behalf of the E H Wachs Companies Position Signature Date EC Declaration of Conformity E H Wachs Company 100 Shepard St Wheeling...

Страница 9: ...rol when material removal is critical to main tain tubing lengths The TSE 1 0 offers fast production operation plus easy handling im proved finishes and consistent cuts It s ideal for contractors fabr...

Страница 10: ...TSE TUBE SQUARING MACHINE SET UP OPERATING INSTRUCTIONS SECTION V...

Страница 11: ...NDLE Holds tool bit C MICROMETER GAUGE Used to determine length and depth of cut D FEED NUT Turn this knob to advance tool E HANDLE Use to gain better leverage while tensioning Collet Nut 1 SPEED RANG...

Страница 12: ...hten lock nut Turn clockwise until workpiece is held firmly 4 Remove workpiece by turning lock nut counter clockwise roughly 1 3 to 1 2 turn C Tool Bit Installation 1 Place tool bit into tool slot Pos...

Страница 13: ...nd Removal Setup 1 To remove stand loosen 1 2 13 x 2 1 2 FHCS To reinstall stand slide FHCS through base plate and support Thread FHCS into TSE main housing and tighten TSE maintenace consists of clea...

Страница 14: ...OPERATIONAL CHARTS GRAPHS SECTION VII...

Страница 15: ...10 pcs 18 701 03 300 Stainless Steel Uncoated Box of 10 pcs 18 701 04 Exotic hard Material Uncoated Individual Exotic Hard Material Inconel Hastelloy etc Custom Tool Bits Available as special Order TO...

Страница 16: ...oad Poor Workpiece End Quality Dull or Chipped Tool Bit Replace Tool Bit Machine Chatters During Cut RPM Speed ofTool Head Refer to Section on MachiningTips is Set Too Fast or Feed Rate is Too Light C...

Страница 17: ...TSE TUBE SQUARING MACHINE PARTS LISTS EXPLODED VIEW DRAWINGS SECTION IX...

Страница 18: ...RT NUMBER QTY DESCRIPTION 1 18 006 00 1 COUPLING DRIVE 2 18 012 00 1 TOOL COLLET NOT SHOWN 3 18 013 01 1 LABEL FEED METRIC NOT SHOWN 4 18 301 00 1 TSE HOUSING ASSEMBLY 5 18 MAN 01 1 MANUAL NOT SHOWN 6...

Страница 19: ...NUMBER QTY DESCRIPTION 1 18 006 00 1 COUPLING DRIVE 2 18 012 00 1 TOOL COLLET NOT SHOWN 3 18 013 01 1 LABEL FEED METRIC NOT SHOWN 4 18 301 00 1 TSE HOUSING ASSEMBLY 5 18 MAN 01 1 MANUAL NOT SHOWN 6 1...

Страница 20: ...RT NUMBER QTY DESCRIPTION 1 18 006 00 1 COUPLING DRIVE 2 18 012 00 1 TOOL COLLET NOT SHOWN 3 18 013 01 1 LABEL FEED METRIC NOT SHOWN 4 18 301 00 1 TSE HOUSING ASSEMBLY 5 18 408 00 1 DRIVE CORDLESS 110...

Страница 21: ...E H Wachs Part No 18 MAN 01 Rev 5 0117 TSE Housing Assembly 18 301 00 NOTES ITEM PART NUMBER QTY DESCRIPTION Rev C...

Страница 22: ...Cordless Electric Drive 18 408 00 2 1 3 ITEM PART NUMBER QTY DESCRIPTION 1 18 035 00 1 BASE STAND 2 18 036 00 1 SUPPORT STAND 3 90 093 13 1 FHCS 1 2 13 X 2 1 2 2 1 ITEM PART NUMBER QTY DESCRIPTION 1...

Страница 23: ...E H Wachs Part No 18 MAN 01 Rev 5 0117 Collet Assembly 18 404 XX NOTES DESCRIPTION ASSEMBLY PART NO ITEM PART NO QTY DESCRIPTION ASSEMBLY PART NO TABLE...

Страница 24: ......

Страница 25: ...ne or estimated All repair work done at our plant will be estimated and the customer advised of cost and time required to complete repair WARRANTY INFORMATION Enclosed with the manual is a warranty ca...

Страница 26: ...600 Knightsbridge Parkway Lincolnshire IL 60069 847 537 8800 www ehwachs com...

Отзывы: