![Wachs RS-2 Скачать руководство пользователя страница 14](http://html2.mh-extra.com/html/wachs/rs-2/rs-2_manual_3101736014.webp)
RS-2
14
CONTROLS AND COMPONENTS
PNEUMATIC RS-2
INTRODUCTION
It is impossible to determine how much torque a
valve stem can take before breaking. Size, age,
condition, tuberculation, and period of time since
last operation will have an effect to this. The
recommended start-up procedure for operating a
valve is to set the RS-2 to its lowest torque setting.
SECTION III
SET-UP AND OPERATION
Ì
!
Lifting Handles
CAUTION: DO NOT connect or disconnect hoses
to valve operator or power source while power
source is operating.
Air Inlet
Torque Gauge
Forward/Reverse
Ring
1/10th Counter
w/Reset Button
Power Head
Torque Adjustment
Universal Handwheel Operation
Dedicated Handwheel Operation
Valve Operator
Extension Handle
Valve Socket
Stop Collar
Valve Key Operation
Drive Plate
Drive Fingers
Straddle Clamps
Long, Medium, Short Torque Arms
Drive Fingers
Universal Handwheel
1” Drive Adapter
On/Off
Trigger
Pneumatic Motor
Содержание RS-2
Страница 6: ...RS 2 6 Section III Set Up Operating Procedures...
Страница 17: ...RS 2 17 Section IV Charts Schematics...
Страница 18: ...RS 2 18 SECTION IV CHARTS SCHEMATIC EIBENSTOCK MOTOR SWITCH SCHEMATIC REVOLUTION COUNTER CONNECTION...
Страница 19: ...RS 2 19 Torque Charts SECTION IV CHARTS SCHEMATIC...
Страница 20: ...RS 2 20 Section V Bill of Materials...
Страница 28: ...RS 2 28 1 Inch DriveAdaptor HandwheelAdaptor Plate Universal Handwheel...
Страница 30: ...RS 2 30...
Страница 31: ...RS 2 31 CLECO AIR MOTOR...
Страница 32: ...RS 2 32 CLECO AIR MOTOR...
Страница 33: ...RS 2 33 CLECO AIR MOTOR...
Страница 35: ......
Страница 36: ...600 Knightsbridge Parkway Lincolnshire IL 60069 847 537 8800 www ehwachs com...