
Figures
6
Operating Instructions | symphony 5.3 A – 06/2009
Fig.1: Device dimensions ...................................................................................... 16
Fig.2: Lift point ....................................................................................................... 16
Fig.3: Stacking........................................................................................................ 17
Fig.4: General views of device .............................................................................. 19
Fig.5: Temperature sensor .................................................................................... 21
Fig.6: Door switch.................................................................................................. 21
Fig.7: Supply interfaces ......................................................................................... 22
Fig.8: Work space layout / Water reservoir .......................................................... 23
Fig.9: Rear panel openings.................................................................................... 24
Fig.10: Support rail installation/removal................................................................. 26
Fig.11: Shelf support/sheet insert installation ........................................................ 27
Fig.12: Gas pressure hose installation .................................................................... 28
Fig.13: Power supply connection............................................................................ 29
Fig.14: RS 232 interface........................................................................................... 29
Fig.15: Example of a connection scheme............................................................... 33
Fig.16: Power switch / Operating panel.................................................................. 37
Fig.17: Removing blower wheel and cover ............................................................ 49
Fig.18: 90 °C decontamination routine procedure ................................................. 51
Fig.19: Temperature calibration .............................................................................. 54
Fig.20: CO
2
calibration............................................................................................. 56
Fig.21: Sterile filter replacement ............................................................................. 58
Fig.22: Device fuse replacement............................................................................. 58
Fig.23: Door seal replacement ................................................................................ 59
Fig.24: CO
2
consumption ........................................................................................ 63