background image

– 4 –

INSTALLATION, OPERATION AND CARE OF

VRB AND VIR SERIES TOP FIRED BROILERS

PLEASE KEEP THIS MANUAL FOR FUTURE USE

GENERAL

Vulcan-Hart Broilers are produced with quality workmanship and material. Proper installation, usage
and maintenance of your broiler will result in many years of satisfactory performance.

It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions
provided.

INSTALLATION

Before installing, verify that the type of gas supply (natural or propane) agrees with the specifications
on the rating plate located on the front left side of the broiler. If the supply and equipment requirements
do not agree, do not proceed with the installation. Contact your dealer or Vulcan-Hart Company
immediately.

UNPACKING

This broiler was inspected before leaving the factory. The transportation company assumes full
responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check
for possible shipping damage. If the broiler is found to be damaged, save the packaging material and
contact the carrier within 15 days of delivery.

Carefully unpack broiler and place in a work-accessible area as near to its final installed position as
possible.

LOCATION

The equipment area must be kept free and clear of combustible substances.

To install the broiler without legs on a non-combustible curb or platform, the front must extend 3" (7.6 cm)
beyond the curb or platform.

To install the broiler on a combustible floor, the 6" (15 cm) legs must be installed, and minimum side
and rear clearances of 6" (15 cm) from combustible construction and 0" from non-combustible
construction must be provided.

The installation location must allow adequate clearances for servicing and proper operation. A
minimum front clearance of 24" (61 cm) is required.

Содержание VRB Series

Страница 1: ...ML 44960Z VRB36FC ML 44957Z VRB36FS ML 44958Z VIR36 ML 44947Z VIR36C ML 44948Z VIR36M ML 44961Z VIR36S ML 44949Z VIR36F ML 44950Z VIR36FM ML 44962Z VIR36FC ML 44951Z VIR36FS ML 44952Z INSTALLATION OPE...

Страница 2: ...E EVENT A GAS ODOR IS DETECTED SHUT DOWN UNITS AT MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPOR...

Страница 3: ...ng the Gas Supply System 6 Flue Connections 6 OPERATION 7 Controls 7 Lighting Instructions 7 Grid Position and Gas Setting 7 Preheating 7 Operating VRB36 Series Models 7 Operating VIR36 Series Models...

Страница 4: ...leaving the factory The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment Immediately after unpacking check for possible shipping damage If the broi...

Страница 5: ...obicoke Ontario Canada M9W 1R3 LEVELING Place a carpenter s level inside the broiler Level the broiler front to back and side to side Unless the broiler is level it will not give proper cooking result...

Страница 6: ...remove air TESTING THE GAS SUPPLY SYSTEM When gas supply pressure exceeds 1 2 psig 3 45 kPa the broiler and its individual shutoff valve must be disconnected from the gas supply piping system When ga...

Страница 7: ...4 To relight follow steps 1 3 GRID POSITION AND GAS SETTING Each operator will find the optimum grid position and gas setting for various products however it is recommended that gas input be reduced...

Страница 8: ...LUBRICATION All moving parts must be checked for wear and lubricated Contact your local Vulcan authorized servicer PILOT LIGHTS Pilot lights are to be kept clean and adjusted at the proper flame heigh...

Отзывы: