Contact us for assistance: (866) 985-7877 | www.wtliving.com
5
ASSEMBLY
1
Connect
Side Panels
D
E
F
G
with
Bolt
6x25mm
/
Washer
O
as shown in Figure 1 using
Allen Wrench
Q
NOTE: Don’t
over tighten the bolt. (The two holes help fix the
Gas Tank Bracket
I
and
Gas Tank Support
J
in Step 2.)
Hardware Used:
8 - Bolt 6x25mm, Washer
PREPARATION
Before beginning assembly, be sure to empty contents of carton and make sure all parts are present. If any parts are missing,
please contact Customer Service at (866)-985-7877, Monday-Friday, 9 a.m. - 6 p.m. EST or email at [email protected].
Place all parts on a soft, level surface for assembly. Tools Required for Assembly (not included): Leak Detection Solution.
Estimated Assembly Time: 60 Minutes | DO NOT over tighten hardware!
2
Connect
Gas Tank Bracket
I
to the holes located at the
bottom of
Side Panels
E
and
G
using 2 -
Bolt 6x22mm/
Washer M6
M
. Then slide ends of
Gas Tank Support
J
onto the
right side of the
Gas Tank Bracket
I
and align the 2 holes on
the front of the
Gas Tank Support
with the 2 holes in the
Door
Frame
F
and secure it to the bottom piece of the
Door Frame
using 2 -
Bolt 6x22mm/Washer M6
M
. NOTE: Don’t put the
Bolts
on too tight; you may need to adjust later.)
Hardware Used:
4 - Bolt 6x22mm, Washer
1
2
E
G
D
F
hole1
hole2
E
F
D
G
M
M
J
I
O