4.5 - GREEN MACHINE
™
- North America - Installation, Operation, Maintenance, & Troubleshooting Manual
Chapter 9: Replacement Procedures
Page 184
5. Install the cover on the GREEN MACHINE and lock the hasps.
6. Remove the locks from lockout & tagout.
7. Turn ON power at the Power Switch on the front of the VST Control Panel. The
GREEN MACHINE is now operational.
Figure 9-33: Removing/Installing the Canister Housing