background image

VTAC USER MANUAL

VPC

10/10/2022

 

For more information visit vpc.com

RETURN TO INDEX

9

Figure C. 

Extraction

PUSH

PLUNGER

IN

FRONT OF 

MODULE

Figure B. 

PROPERLY

SEAT

EXTRACTION 

TOOL PINS

INSIDE

MODULE

GRIPS

PLUNGERS

Figure A. 

BLUE INSERT ON 

TOP ( INDENTED 

CIRCLES ON TOP)

INSTALLATION 

1. 

Ensure the VTAC Insert(s) is in line with the corresponding module slot(s). Inserts are 
installed from the rear side of the ITA module.  Place the insert in with the (3) circular bosses 
facing down(

Figure A

). When installing a patchcord containing multiple VTAC inserts, the 

blue insert should always be installed on top (

Figure A

). 

2. 

Load module beginning at the top and moving downward.  

3. 

Apply gentle pressure and the insert(s) should easily snap into place. Force should 
not be needed when inserting. If force is required,  incorrect orientation is being used 
for installation. Consult the VTAC Insert Feature Identification page in this manual for 
assistance with proper installation orientation.  

4. 

The insert(s) is fully seated when the rear of the tool(s) is flush with the rear edge of the 
module frame (

Figure B

). 

REMOVAL

5.  All inserts grouped together for a patchcord, must be extracted at the same time.

  

6. 

The VTAC Extraction Tools should be grouped together to allow for removal of multiple 
inserts simultaneously. Each tool is magnetized and grooved to make grouping easier.   

7. 

The extraction tool is used on the front side of the ITA module. Grasp the tool(s) from 
the sides and slide the tool pins into the square cavity holes located on the inside of the 
module frame on either side of the insert(s) to be removed (

Figure B

). If using multiple 

tools simultaneously, make sure that all pins are properly inserted into each corresponding 
cavity. The tool frame should be seated against the frame body if pins are inserted correctly 
and completely (

Figure B

). 

8. 

Tool(s) must be seated against the module frame before the plunger is pushed in. Otherwise 
damage to insert(s) may occur. Push plunger in fully.  The insert(s) should be ejected out the 
opposite side of the module (

Figure C

). 

9. 

Force should not be needed to extract inserts. If inserts do not extract easily, ensure all tool 
pins are fully seated in the correct location and try again. 

INSERT INSTALLATION/REMOVAL SIM MODULES- ITA

PART # 510 171 101,  910 112 130

TIER A

TIER B

Содержание 310 130 113

Страница 1: ...ATURE IDENTIFICATION ITA 7 i2 MX VTAC RAIL INSTALLATION REMOVAL RECEIVER ITA 8 INSERT INSTALLATION REMOVAL SIM MODULE i2 MX RECEIVER 9 INSERT INSTALLATION REMOVAL SIM MODULE ITA 10 INSERT INSTALLATION...

Страница 2: ...sses are intended to mate with the circular indentations on the opposite side of the insert to make grouping easier 1 The VTAC Pass Thru Insert has both a front mating end Figure A and rear mating end...

Страница 3: ...he front side and is marked with a notch Figure C When the module is oriented correctly this notch is located in the upper left corner of the front side 2 The front is the mating side of the module an...

Страница 4: ...eceiver module Figure B It also provides access to the extraction tool cavities Figure C 3 The rear side contains the position A1 notch and markings closest to the edge of the frame Figures B C Wiring...

Страница 5: ...t Figure B The front also has a polarizing feature which prevents incorrect engagement with the ITA Figure B Finally the front features a latch for secure mating with the ITA Figure A 2 Position A1 is...

Страница 6: ...keying receptacle at the bottom of the front Figure B The front also has a polarizing feature which prevents engagement with the receiver in an incorrect orientation Figure B Finally the front featur...

Страница 7: ...es are determined as such when viewing from the rear wiring side of the ITA 3 After rails are installed place frame bottom on a flat surface then re fasten halves together by re tightening the Phillip...

Страница 8: ...ure and the insert s should easily snap into place Force should not be needed when inserting If force is required incorrect orientation is being used for installation Consult the VTAC Insert Feature I...

Страница 9: ...e rear edge of the module frame Figure B REMOVAL 5 All inserts grouped together for a patchcord must be extracted at the same time 6 The VTAC Extraction Tools should be grouped together to allow for r...

Страница 10: ...ed that includes an even pattern of blank slots to allow for less pressure and bending at the ITA insertion base Extra spacing between patchcords helps to ensure wire integrity and performance REMOVAL...

Страница 11: ...vent the introduction of dust or extraneous air flow into the test system Figure C 4 Loading in SIM modules or the i2 MX should still begin in Tier A Figure A Beginning in Tier A is especially importa...

Страница 12: ...ion Insert is not keyed PCB MOUNTING HOLES TOP ALIGNMENT POSTS PCB MOUNTING SURFACE LATCH RIGHT ANGLE HEADER 1 The top is located opposite of the compliant pins Figure C 2 The compliant pins and PCB a...

Страница 13: ...talled via press fitting using VPC s special installation tool For a brief video version of these instructions please click here to access a video tutorial on VPC s YouTube channel INSTALLATION 1 Load...

Страница 14: ...INS CONTACTS Figure H Join both halves of tool Figure I Check alignment of contacts and alignment pins with holes CHECK ALIGNMENT ALIGNING PCB AND USING PRESS 6 Position the board so that the contacts...

Страница 15: ...y pushing on the front surface After the tool has been released lift it off the PCB Figure K 13 Verify that the header s are fully seated against the board along the edge Figure L USINGVTACRIGHTANGLEH...

Страница 16: ...angle headers Ensure that the necessary module slots contain mating inserts for the PCB s mounted headers For the purpose of this application the mating side of the VTAC Pass Thru insert is the rear 2...

Страница 17: ...provided pan head Phillips screws 3 Ensure that the VTAC Retention insert s is aligned with the corresponding module receiver position s Also ensure that any VTAC Right Angle Inserts are aligned with...

Страница 18: ...oth faces of the insert are symmetrical Figure C Figure A 1 The top mating end is located opposite of the compliant pins Figure A 2 The compliant pins mate with the PCB via use of VPC Insertion Tool p...

Страница 19: ...her side of the base These alignment pins will be used later to locate the PCB and the base Figure B 3 Load the desired number of headers into the base Insert so that the top mating end is placed into...

Страница 20: ...igure C 5 Press the top down onto the PCB and towards the base pushing the compliant pins of the header into the PCB Do not over press 6 Remove the PCB from the tool and verify the installation of eac...

Отзывы: