10.3 Servicing intervals
Servicing interval
A
B
C
1 - shift operation
Before start of work
Monthly
12 Monthly
2 - shift operation
Before start of work
Weekly
6 Monthly
3 - shift operation
--
--
--
NOTE!
The intervals given in the servicing table are standard values for normal operating
conditions.
The intervals are to be shortened appropriately under more intensive working
conditions, multiple shift operation and longer working times.
Safety devices are to be tested monthly.
INFORMATION!
If not otherwise stated in the separate servicing tables, more precise information on
the exact settings is to be found in the chapter "Controls and settings work before
first starting up/re-starting of line".
The precise replacement work is described in the chapter "Servicing and Repairs".
Servicing intervals - pneumatics EBP 580
Work to be carried out
A
B
C
Check piston rod for visible damage
X
Check cylinders, connections and pipelines for leaks
X
Check bellows cylinder for visible damage
X
Check valves for functionality
X
Check tightness of fixture screws
X
Check the correct setting of the pressure regulator (see the chapter "Controls and
settings work before first starting up/restarting of line")
X
Servicing intervals - Electrical system complete
Work to be carried out
A
B
C
Check the electrical connections, links, switches, drives and fuse protection
X
Check tightness of fixture screws
X
Servicing intervals - base frame
Work to be carried out
A
B
C
Check trough weld seams for visible damage (tears)
X
Check screen belt weld, flanks and closures for visible damage
X
Check troughs for visible damage
X
Servicing intervals - rollers
Work to be carried out
A
B
C
Lubricate all bearings and guide profiles with foodstuff compatible
grease (see the chapter "Lubricants Overview")
X
Check rollers for visible damage
X