Operating
VAS 6911A Operating Manual V9.00 12/19 All rights reserved.
4-1
4
Operating
4.1
Preparation
Prepare the VAS6911A for operation. (
Chap.
3 „
Start-up
“).
4.1.1
Leakage Test
1. Start the software by selecting
Start│
VAS DSS
.
2. Click on
Diagnostic
│
Leaktest
.
Fig. 4-1 DSS manager