background image

Supplied By www.heating spares.co  Tel. 0161 620 6677

34

UNICA BHE

SECTION 10

LPG INSTRUCTIONS

10.1 RELATED DOCUMENTS

 

 BS 5440

PARTS 1 & 2

FLUES & VENTILATION REQUIREMENTS

  BS 5449

PART 1

FORCED CIRCULATION OF HOT WATER SYSTEMS

  BS 5482

PART 1

DOMESTIC BUTANE & PROPANE GAS BURNERS IN PERMAMENT
DWELLINGS

  BS 5546

INSTALLATION OF GAS HOT WATER SUPPLIES FOR DOMESTIC
PURPOSES

  BS 6798

INSTALLATION OF BOILERS OF RATED NOT EXCEEDING 60kW

10.2  TECHNICAL DATA

Gas Pressures

Unica 32BHE

I

nlet pressure

37.0mbar

Maximum gas rate (kg/hr)

2.48

Minimum gas rate (kg/hr)

0.54

Injector size

4.7mm

CO

2

 max (%)

10.0

CO

2

 min (%)

10.0

CO max (mg/kWh)

200

CO min (mg/kWh)

20

NOx max (PPM) mg/kWh

50

NOx min (PPM) mg/kWh

30

CO/CO

ratio @ max

0.002 to 1

CO/CO

2

 ratio @ min

0.0002 to 1

SEDBUK ‘A’ (%)

92.7

10.3

CONVERTING THE APPLIANCE GAS TYPE

To convert the appliance to another gas type it is
necessary to change the burner injector, adjust
the appliance fan speeds and adjust the gas valve
(CO

2

).

To change the injector see 6.12.1

To adjust the fan speeds see 10.7

To adjust CO2 values see 10.6

10.4

GAS SUPPLY

The gas supply must be connected to the appli-
ance by a competent LPG installer and must be
of sufficient size to supply the appliance at its
maximum output. An existing supply must be
checked to ensure that it is of adequate size to
deal with the maximum rated input of this and
any other appliances that it serves.

10.5

GAS SUPPLY INSTALLATION

The entire installation including the meter must
be purged and checked for gas tightness.

10.6

CHECKING THE  CO

2

 AND ADJUSTING THE

GAS VALVE
THE GAS VALVE MUST BE SET-UP OR AD-
JUSTED WITH THE AID OF A PROPERLY CALI-
BRATED FLUE GAS ANALYSER.

Isolate the appliance from the electrical supply
and remove the appliance casing as described in
4.7.1. Set the flue gas analyser to read CO

2

 and

insert the probe into the flue analysis test point (

A,

fig. 35). Restore the electrical supply to the

boiler and switch the boiler to the OFF mode. To
adjust the gas valve you must first ensure that the
fan speed potentiometers (trimmers) have been
set correctly (see 10.7).
Remove the 3-selector knobs, locate and press
the CO button (fig. 36). The appliance will now

operate in CO mode for approximately 15-minutes
(see 7.10).

10.6.1 GAS VALVE MAXIMUM SETTING

Locate and gently turn the HTG trimmer till the
maximum value fan speed (max) is obtained and
check that it corresponds with the appropriate CO

2

value (maximum) for the respective appliance. If
the CO

2

 reading is correct, proceed to gas valve

minimum setting (10.6.2).
However, if the CO

2

 reading is incorrect, the

maximum gas pressure must be adjusted as
follows:

using a 2.5mm Allen key, very slowly turn the
maximum adjustment screw (fig. 38) – clock-
wise to decrease, counter clockwise to increase
– until the correct value is displayed on the CO

2

analyser (allow time for the analyser to stabi-
lise).

10.6.2 GAS VALVE MINIMUM SETTING

Locate and gently turn the HTG trimmer till the
minimum value fan speed (min) is obtained and
check that it corresponds with the appropriate CO

2

value (minimum) for the respective appliance. If
the CO

2

 reading is correct, rotate the HTG trim-

mer until the correct value is obtained for the re-
spective appliance (see fan speed table) and pro-
ceed to 10.6.3.
However, if the CO

2

 reading is incorrect, the mini-

mum gas pressure must be adjusted as follows:

using a suitable screwdriver, very slowly turn the
minimum adjustment screw (fig. 38) – clockwise
to increase, counter clockwise to decrease -
until the correct value is displayed on the CO

2

analyser (allow time for the analyser to stabi-
lise).

Содержание Unica BHE

Страница 1: ...SE INSTRUCTIONS TO BE RETAINED BY USER Vok ra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK...

Страница 2: ...5 Pre operation checks 17 5 6 Initiallighting 17 5 7 Checking gas pressure combustion analysis 17 5 8 Final flushing of the heating system 18 5 9 Setting the boiler operating temperature 18 5 10 Setti...

Страница 3: ...ith an annular co axial combustion air intake that can be rotated horizontally through 360 degrees for various horizontal or vertical applications The Unica BHE can also be used with the Vokera twin f...

Страница 4: ...stic hot water to be pre heated DHW temperature selector Move the selector clockwise to increase the hot water outlet temperature or counter clockwise to reduce the temperature Heating temperature sel...

Страница 5: ...irement When the appliance reaches the desired tempera ture the burner will shut down and the boiler will perform a three minute anti cycle timer delay When the request for heat has been satisfied the...

Страница 6: ...ht kg 2 6 Clearances UNICA BHE Range Sides Left 12mm Right 25mm Top 150mm from casing or 25mm above flue elbow whichever is applicable Bottom 150mm Front 600mm 2 7 Connections UNICA BHE Range Flow ret...

Страница 7: ...he car port into the building 1200 mm M Vertically from a terminal on the same wall 1500 mm N Horizontally from a terminal on the same wall 300 mm P From a structure to the side of the vertical termin...

Страница 8: ...5440 PART 1 FLUES BS 5440 PART 2 FLUES VENTILATION BS 5449 PART 1 FORCED CIRCULATION HOT WATER SYSTEMS BS 5546 INSTALLATION OF GAS HOT WATER SUPPLIES FOR DOMESTIC PURPOSES BS 6798 INSTALLATION OF BOI...

Страница 9: ...r see fig 5A The cold feed from the make up vessel or tank must be fitted with an approved non return valve and stopcock for isolation purposes The feed pipe should be connected to the return pipe as...

Страница 10: ...g must be considered If installed less than 2m above a pavement or platform to which people have access including balconies or flat roofs the terminal must be protected by a guard of durable material...

Страница 11: ...fitted in accordance with I S 813 and local Building Regulations The Institute of Gas Engineers publication IGE UP 7 Guide for Gas Installations in Timber Frame Buildings gives specific advice on this...

Страница 12: ...iance has been decided using the template supplied carefully mark the position of the wall mounting bracket see fig 8 and flue hole if applicable If you intend to run the pipe work vertically behind t...

Страница 13: ...A 524 45 degreebends pair N A 525 500mmextension 500mm 526 1000mmextension 1000mm 527 2000mextension 2000mm 528 Telescopic extension 350 730mm 529 Wall bracket pack 5 208mm Using the template provide...

Страница 14: ...move any burrs and check that all seals are lo cated properly You must ensure that the entire flue system is properly supported and connected Seal the flue assembly to the wall using cement or a suita...

Страница 15: ...n that of a concentric flue system It can be used for horizontal or vertical applications however the twin flue system must be converted to the dedi cated concentric flue kit for termination It is ess...

Страница 16: ...onto the concentric to twin converter ensuring that the exhaust pipe connects to the exhaust connection on the con centric to twin converter If necessary cut the plain ends male of the twin flue pipe...

Страница 17: ...GAS fig 16 The appliance is supplied with a 15mm service valve connect a 15mm pipe to the inlet of the valve and tighten both nuts NOTE Itwillbenecessarytocalculatethediameterofthe gas supply pipe to...

Страница 18: ...HE AP PLIANCE The supply cable from the isolator to the appliance must be 3 core flexible sized 0 75mm to BS 6500 or equivalent Wiring to the appliance must be rated for operation in contact with sur...

Страница 19: ...er and system from the lowest points Open the drain valve full bore to remove any installation debris from the boiler prior to lighting Refill the boiler and heating system as described in 5 3 5 5 PRE...

Страница 20: ...rate restrictor that limits the maximum flow rate that can be drawn through the appliance The restrictor eliminates the need to manually adjust the DHW flow rate However if it is felt necessary to fur...

Страница 21: ...romanydebrisorobstruction Check and clean if necessary the condense trap to ensure correct operation 6 3 REPLACEMENTOFCOMPONENTS Although it is anticipated that this appliance will give years of relia...

Страница 22: ...t component removal procedure as de scribed in 6 4 Unclip and remove the air chamber front cover Unclip the return thermistor from the return inlet pipe Disconnect thermistor electrical plug Replace i...

Страница 23: ...crews A for electrode and remove Remove the retaining nut C for condense sensor D and remove 6 15 BURNER fig 30 Carry out component removal procedure as described in 6 4 Unclip and remove the air cham...

Страница 24: ...C and condense connections on the heatexchanger Locateandremovethe4 screws thatsecuretheheatexchangertothecombustion chamber D Movetheheatexchangertotheright and disconnect it from the flue collector...

Страница 25: ...TUATOR fig 35B Carry out component removal procedure as de scribed in 6 4 Remove the locking pin F that secures the actuator G to the heating manifold Disconnect the electrical plug from the actuator...

Страница 26: ...l other functions are disabled minimumpoweroperatingperiod anti cycle set point etc Once enabled the CO function will remain active for a 15 minute pe riod oruntilthefunctionismanuallydeactivated FROS...

Страница 27: ...led on the appliance data badge 7 3 1 CHECKING ADJUSTINGTHEAPPLIANCEFAN SPEEDS Move the selector switch to the OFF position and remove the 3 selector knobs 7 3 2 ABSOLUTE MAX FAN SPEED Locate the MAX...

Страница 28: ...eck wiring check electrical supply No hot water Check pipe work No heating Check external controls Fault code Possible cause 10 Check gas supply check flue system check polarity 7 8 ELECTRICALCHECKS A...

Страница 29: ...W ON hysterisis C SP 3 Anti cycle delay 3 min Pump over run 30 sec Low output min output Min 25 CO function max temp C 95 CO re light temp C 75 CO function time 15 min Flow NTC max temp C 95 High limi...

Страница 30: ...ntact Vokera technical fordetailedinstructiononspecificOT controls vokera external sensor 8 3 OTHERDEVICES Contactthecontrolsmanufacturerand orVokera technical department should you require more speci...

Страница 31: ...onnection to PCB low voltage F O H T Flow over heat thermostat F T Fume thermostat G Cable connector M3 M5 Terminal strip for supply in clock room thermostat M2 M4 Terminal strip for condense pump low...

Страница 32: ...028557 26 Instrumental panel 20011082 27 Knob assembly R10028559 31 Instrumental panel 20011393 40 Door panel R10030136 64 Frame assembly R10028809 65 Case cover 20011392 67 Wiring box R01005468 78 Hi...

Страница 33: ...R5041 248 Washer R5208 265 Washer R5236 266 Washer R5237 290 Clip R2165 292 O ring R7999 351 Nut R1823 353 Nut R1824 636 Detector 20004978 24 201 26 40 200 7 201 265 30 200 201 2 292 4 202 636 22 31...

Страница 34: ...19 Glass stopper assembly R10026328 27 Plug R10023805 35 Air gas conveyor R10028420 39 Pipe 20000769 46 Gas diaphragm R10027161 67 Washer 62 R10026322 69 Tryton R10028425 72 Mixer R10024295 79 Flame...

Страница 35: ...ing exchanger assembly R01005366 7 Conveyor R10028623 12 Flue drain connection R10028421 27 Nut screw R10020625 475 Washer 125 R10026323 482 Washer R10026366 487 Washer 60 R10026345 552 Washer 60 R100...

Страница 36: ...ance from the electrical supply and remove the appliance casing as described in 4 7 1 Set the flue gas analyser to read CO2 and inserttheprobeintotheflueanalysistestpoint A B fig 35 Restore the electr...

Страница 37: ...ted according to the respective appliance specifica tion as detailed on the appliance data badge 10 7 1 CHECKING ADJUSTINGTHEAPPLIANCEFAN SPEEDS Move the selector switch to the OFF position and remove...

Страница 38: ...ns and or BS5546 BS6798 Yes ALL INSTALLATIONS If required by the manufacturer record the following CO2 OR CO ppm OR CO CO2 Ratio The heating and hot water system complies with the appropriate Building...

Страница 39: ...CORGI ID Number Comments Signature SERVICE 7 Date Energy Efficiency Checklist completed Yes No Engineer Name Company Name Telephone Number CORGI ID Number Comments Signature SERVICE 9 Date Energy Effi...

Страница 40: ...ies vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0844 391 099 F 0844 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited reserve th...

Отзывы: