HOW TO...
3.1
HOW TO TOP-UP THE SYSTEM PRESSURE
(fig. 5)
The system pressure must be checked periodi-
cally to ensure the correct operation of the boiler.
The pressure on the display should be reading
between 1 and 1.5 BAR when the boiler is in an off
position and has cooled to room temperature. If
the pressure requires ‘topping-up’ use the follow-
ing instructions as a guide.
●
Locate the filling valve connections (usually
beneath the boiler).
●
Attach the temporary filling connection to both
control valves.
●
Open both control valves slowly until you hear
water entering the system.
●
Close the control valves when the pressure
gauge (on the boiler) reads between 1 and 1.5
BAR.
●
Remove the temporary connection from the
control valves.
3.2
HOW TO RESET THE APPLIANCE
When the RESET icon is displayed, the appliance
will require to be reset manually. Before resetting
the boiler ensure that the pressure gauge is indi-
cating the correct level. Allow a period of two
minutes to elapse before pressing the reset but-
ton.
IMPORTANT
If the appliance requires to be reset frequently, it
may be indicative of a fault, please contact your
installer or Vokera Customer Services for further
advice.
3.3
HOW TO SHUT DOWN THE SYSTEM FOR
SHORT PERIODS
The system and boiler can be shut down for short
periods by simply turning the time clock to the off
position. It is also advisable to turn off the main
water supply to the house.
3.4
HOW TO SHUT DOWN THE SYSTEM FOR LONG
PERIODS
If the house is to be left unoccupied for any length
of time – especially during the winter – the system
should be thoroughly drained of all water.
The gas, water and electricity supply to the house
should also be turned off. For more detailed advice
contact your installer.
3.5
HOW TO CARE FOR THE APPLIANCE
To clean the outer casing use only a clean damp
cloth. Do not use any scourers or abrasive clean-
ers.
Fig. 5
flow/return
pipe
control
valve
temporary
connection
control
valve
supply
pipe
double
check valve