14
Mynute 24m
Control panel screws and casing screws
Fig. 14
4.7.2
ELECTRICAL CONNECTION
The appliance terminal strip is located behind the
control fascia (fig. 15). Locate and remove the 4
screws securing the control PCB cover.
NOTE
The appliance comes with a factory fitted link to
allow basic operation of the boiler via the selector
switch. If external controls are required please
refer to the wiring diagrams in section 8 for more
detailed information.
4.7.3
CONNECTING THE MAINS (230V) INPUT (fig. 17)
Remove the control PCB cover as described in
4.7.2. Pass the cable through the cable anchorage
(fig. 6). Connect the supply cable wires (earth, live
and neutral) to their corresponding terminals on
the terminal strip. Ensure that the EARTH wire is
left slightly longer that the others, this will prevent
strain on the Earth wire should the cable become
taut.
Do not remove the “link wire”(fig. 17) unless
additional external controls are to be fitted (see
section 8). Re-fit the electrical input board cover.
The securing screw on the cable anchorage should
now be tightened. This must be done before the
control fascia is re-fitted in.
NOTE
This appliance requires a permanent live supply.
Fig. 15
Fig. 17
Fig. 16
Outlet
test-point
Inlet
test-point
Protective
cap
2 AF fuse
blue
brown
bro
wn
blue
yello
w-g
reen
blac
k
blac
k
T.A.
power cable
fuse
link wire