Commissioning
2.1 Initial Inspection
The PCU-10 comes programmed and ready for connection. Prior to setup and installation you
should check the delivery for shipping damages. If damages have occurred, do not operate the
PCU-10. Inform customer service or the manufacturer immediately. The PCU-10 is to be transport-
ed using the appropriate means and should be protected from tipping or water damage. Be sure to
set it up on a level surface.
2.2 Important Instructions for supplying gas
The respective gases may only be supplied to the gas mixture and regulation system via the ap-
propriately designated gas connections. The system itself must be tested for leaks.
On the gas supply side of the system make certain that the maximum permissible supply pressure
is not exceeded.
Only then should you operate a gas mixture and regulation system with the PCU-10.
2.3 Connecting the System
External electrical connections, if required, should only be performed by professionals.
Warning:
The length of the cable provided by the factory may only be altered upon consultation!
1. Use the supplied connector plug to connect the device to an appropriate socket with
grounding contact 230V / 50 Hz.
2. A sufficiently sized power supply is built in the device for operation of the devices
(230V AC / +24 V DC).
3. Use the ON/OFF switch on the rear to switch the device on.